Laserfiche WebLink
SAN LEANDRO GENERAL PLAN UPDATE FINAL EIR <br />CITY OF SAN LEANDRO <br />EXECUTIVE SUMMARY <br />LTS = Less Than Significant S = Significant SU = Significant Unavoidable Impact N/A = Not Applicable <br />2-26 AUGUST 2016 <br />TABLE 2-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Impact <br />Significance <br />before <br />Mitigation Mitigation Measures <br />Significance <br />after <br />Mitigation <br />However, the implementation and timing of the Mitigation <br />Measure is not under the City’s control and widening I-880 is not <br />considered to be feasible due to cost and freeway right-of-way <br />constraints. . Consequently, the Cumulative plus Proposed Plan <br />impact remains significant and unavoidable. <br /> I-880 Southbound segment between Marina Boulevard and <br />Washington Avenue would operate at LOS F during the PM peak <br />hour under cumulative plus Proposed Plan condition, which is <br />considered to be significant. <br />Implementation of the following measure would improve freeway <br />segment operations during the AM peak hour to LOS D or better <br />and lessen the Proposed Plan impact to less than significant: <br /> Add additional capacity to the freeway segment by increasing <br />the number of travel lanes in the southbound direction. <br />However, the implementation and timing of the Mitigation <br />Measure is not under the City’s control and widening I-880 is not <br />considered to be feasible due to cost and freeway right-of-way <br />constraints. . Consequently, the Cumulative plus Proposed Plan <br />impact remains significant and unavoidable. <br /> I-238 Eastbound segment between Hesperian Boulevard and SR <br />185 would operate at LOS E during the PM peak hour under <br />cumulative plus Proposed Plan condition, which is considered to <br />be significant. <br />Implementation of the following measure would improve freeway <br />segment operations during the AM peak hour to LOS D or better <br />and lessen the proposed Plan impact to less than significant: <br /> Add additional capacity to the freeway segment by increasing <br />the number of travel lanes in the eastbound direction. <br />However, the implementation and timing of the Mitigation <br />Measure is not under the City’s control and widening I-880 is not <br />considered to be feasible due to cost and freeway right-of-way <br />constraints. . Consequently, the Cumulative plus Proposed Plan <br />impact remains significant and unavoidable.