Laserfiche WebLink
SAN LEANDRO GENERAL PLAN UPDATE FINAL EIR <br />CITY OF SAN LEANDRO <br />EXECUTIVE SUMMARY <br />LTS = Less Than Significant S = Significant SU = Significant Unavoidable Impact N/A = Not Applicable <br />2-30 AUGUST 2016 <br />TABLE 2-1 SUMMARY OF IMPACTS AND MITIGATION MEASURES <br />Impact <br />Significance <br />before <br />Mitigation Mitigation Measures <br />Significance <br />after <br />Mitigation <br />UTIL-12: The proposed project, in combination with past, <br />present, and reasonably foreseeable projects, would <br />result in less-than-significant cumulative impacts with <br />respect to stormwater infrastructure. <br />LTS N/A N/A <br />UTIL-13: Implementation of the proposed project would <br />not result in a substantial increase in natural gas and <br />electrical service demands, and would not require new <br />energy supply facilities and transmission infrastructure or <br />capacity enhancing alterations to existing facilities. <br />LTS N/A N/A <br />UTIL-14: The proposed project, in combination with past, <br />present, and reasonably foreseeable development, would <br />result in less-than-significant impacts with respect to <br />energy conservation. <br />LTS N/A N/A <br /> <br />