Laserfiche WebLink
PLACEWORKS 3-1 <br /> Revisions to the Draft EIR 3. <br />This chapter presents changes to the Draft EIR that resulted from preparation of responses to comments <br />on the Draft EIR, or were staff-directed changes including typographical corrections and clarifications. In <br />each case, the Draft EIR page and location on the page is presented, followed by the textual, tabular, or <br />graphical revision. Double underline text represents language that has been added to the EIR; text with <br />strikethrough has been deleted from the EIR. <br />None of the revisions constitutes significant new information added to the analysis contained in the Draft <br />EIR. As such, the Draft EIR does not need to be recirculated for public review. <br />All changes to Draft EIR Table 2-1, Summary of Impacts and Mitigation Measures, are updated in Chapter <br />2 of this Final EIR. <br />3.1 REVISIONS TO CHAPTER 1, EXECUTIVE SUMMARY <br />Section 1.3 on page 1-4, continuing onto page 1-5, of the Draft EIR is hereby amended as follows: <br />This Draft EIR analyzes alternatives to the proposed project that are designed to reduce the significant <br />environmental impacts of the proposed project and feasibly attain most of the proposed project <br />objectives. There is no set methodology for comparing the alternatives or determining the <br />environmentally superior alternative under CEQA. Identification of the environmentally superior <br />alternative involves weighing and balancing all of the environmental resource areas by the City. The <br />following alternatives to the proposed project were considered and analyzed in detail: <br /> No Project Alternative <br /> Reduced Floodplain Development Alternative <br /> Reduced Industrial Alternative <br />Chapter 6, Alternatives to the Proposed Project, of this Draft EIR, includes a complete discussion of these <br />alternatives and of alternatives that were rejected for various reasons. <br />1.3.1 No Project Alternative <br />Consistent with Section 15126.6(e)(2) of the CEQA Guidelines, under the No Project Alternative, the <br />proposed project would not be adopted or implemented, and further development in the city would <br />continue to be subject to existing policies, regulations, development standards, and land use designations <br />under the existing San Leandro General Plan.