My WebLink
|
Help
|
About
|
Sign Out
Home
4B1 Public Hearing 2016 0919
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0919
>
4B1 Public Hearing 2016 0919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 3:00:58 PM
Creation date
9/13/2016 3:00:26 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/19/2016
Retention
PERM
Document Relationships
Reso 2016-117
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
SAN LEANDRO GENERAL PLAN UPDATE DRAFT FEIR <br />CITY OF SAN LEANDRO <br />REVISIONS TO THE DRAFT EIR <br />3-6 AUGUST 2016 <br />The first paragraph under the heading “City of San Leandro, Alameda CTC, and Caltrans” on page 4.13-32 of <br />the Draft EIR is hereby amended as follows: <br />The LOS standard for signalized intersections in the City of San Leandro is LOS D or better at City- <br />controlled intersections. For The ACTC does not have an adopted threshold, therefore, the City’s LOS D <br />standard will be used for those intersections that are located on the CMP network, the LOS standard is <br />LOS D. The LOS standard for signalized intersections within Caltrans’ jurisdiction is LOS C or better. The LOS <br />standard for each study intersection is indicated in Table 4.13-10. <br />The last paragraph on page 4.13-32 of the Draft EIR is hereby amended as follows: <br />An impact would be potentially significant if it exceeded the proposed current LOS standard. This section <br />includes measures to mitigate impacts associated with the proposed Plan to the existing standard LOS D at <br />all intersections as well as measures to mitigate impacts associated with the proposed Plan to LOS E at <br />intersections within PDAs, as considered in the proposed Plan. <br />The first paragraph under the heading “CMP Analysis Impact Criteria” on page 4.13-34 of the Draft EIR is <br />hereby amended as follows: <br />The LOS standard for CMP is LOS E. The Alameda CTC's CMP does not establish significance thresholds for <br />designated roadways for the purposes of the Land Use Analysis Program (LUAP). The following thresholds <br />are based on prior studies conducted in San Leandro and will be used to identify impacts. If the CMP <br />segment operates worse than LOS E then traffic impacts on the MTS would occur when the addition of <br />traffic associated with implementation of the Proposed Plan causes: <br />Mitigation Measure TRAF-1A as it pertains to Intersections #3 and #4 on page 4.13-44, continuing onto page <br />4.13-45, of the Draft EIR is hereby amended as follows: <br /> E. 14th Street and Davis Street (SR-112) (#3): The addition of Cumulative with proposed Plan traffic <br />would cause the intersection level of service to degrade from LOS C to LOS F in the AM peak hour. <br />Therefore, the Cumulative with Proposed Plan impact is considered to be significant. <br />Implementation of the following measures would improve intersection operations during the AM <br />peak hour to LOS D: <br /> Add an additional northbound left-turn lane on E. 14th Street. This would result in the <br />northbound approach having two exclusive left-turn lanes, an exclusive through lane, and a <br />shared through/right-turn lane. <br /> Optimize the traffic signal cycle length and splits in conjunction with adaptive traffic control <br />technology. <br />Because this intersection is within the East 14th Street Downtown Transit-Oriented Development <br />PDA, implementation of the following measures would improve intersection operations during <br />the AM peak hour to LOS E:
The URL can be used to link to this page
Your browser does not support the video tag.