My WebLink
|
Help
|
About
|
Sign Out
Home
4B2 Public Hearing 2016 0919
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 0919
>
4B2 Public Hearing 2016 0919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 3:01:01 PM
Creation date
9/13/2016 3:00:58 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/19/2016
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
General Plan Addendum * August 26, 2016 Page 4 <br /> <br />Page 3-96 Action LU-8.3.A text—correct typo in first sentence, third line: <br /> <br /> …uses such as offices are not either not permitted or require a conditional <br />use permit. <br /> <br />Page 3-97 Edit Action LU-8.9.A as follows: (Planning Commission, City Council, Public) <br /> <br /> Action LU-8.9.A: East 14th Corridor Plan Updates <br /> Update City plans for the East 14th Street Corridor, including the portion <br />of the corridor covered by the North Area Plan (Downtown to the <br />Oakland City limits) and the South Area Development Strategy <br />(Downtown to 150th Avenue). An Area Plan update for the northern part <br />of East 14th, as well as the Bancroft and MacArthur corridors (see Action <br />LU-8.11.A) is one of the highest priorities of this General Plan and should <br />be initiated within two years after the General Plan is adopted, if feasible. <br /> <br />Page 4-2 In first line of first full paragraph, replace “Smart phone” with “Smartphone” (8/25 <br />Planning Commission testimony) <br /> <br />Page 4-15 Last paragraph, first sentence: Replace “accidents” with “collisions.” (Bike East <br />Bay) <br /> <br /> Recommended safety improvements include special bicycle crossings <br />(including signalized crossings) near schools, and pavement maintenance <br />programs to reduce the risk of collisions accidents. <br /> <br />Page 4-20 Replace photo of elevated BART tracks with a photo of people boarding a train at <br />San Leandro station (staff) <br /> <br />Page 4-31 Second full paragraph on page, third sentence, replace “accident” with <br />“collision” (Bike East Bay) <br /> <br /> Vehicle and pedestrian safety is an ongoing issue for at-grade crossings. <br />Continued driver, bicyclist and pedestrian education is necessary to <br />reduce collision accident hazards. <br /> <br />Page 4-32 Replace photo of Amtrak train crossing Halcyon with a better photo of an <br />Amtrak train (not moving through an active crossing) (staff) <br /> <br />Page 4-40 Replace “accident” with “collision” in first bullet at bottom of page (Bike East <br />Bay): <br /> <br /> This project will reduce collision accident hazards, reconstruct the <br />median,…..
The URL can be used to link to this page
Your browser does not support the video tag.