My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2016-120
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2016
>
Reso 2016-120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 4:47:09 PM
Creation date
10/7/2016 4:13:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
9/19/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 0919 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0919
8D Consent 2016 0919
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 0919
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />CITY OF SAN LEANDRO <br />WATER POLLUTION CONTROL PLANT REHABILITATION PROJECT <br />(PROJECT NO. 08-593-52-239) <br />PROJECT CLOSEOUT SUPPORT SERVICES <br />SCOPE OF SERVICES <br />INTRODUCTION <br />The City of San Leandro (City) owns and operates a 7.6-mgd rated average dry weather flow (ADWF) <br />Water Pollution Control Plant (WPCP) located in San Leandro, California. Carollo Engineers (Consultant) <br />performed design services for the WPCP Rehabilitation Project, to restore the capacity and function of the <br />WPCP with improvements to various existing facilities and by adding new facilities. Construction of the <br />project was recently completed by S.J. Amoroso Construction Co., Inc. Construction Management of the <br />project was provided by the City staff with assistance from Carollo Engineers. <br />SCOPE OF SERVICES <br />Consultant's Scope of Services for this CSA, herein, incorporates incomplete tasks carried over from the <br />expired CSA dated August 2, 2011. <br />In addition, Consultant's Scope of Services includes providing engineering services during project closeout <br />phase to the City's staff. <br />Task 1— As -needed Assistance with Project Closeout (New). <br />Consultant shall provide as -needed assistance to the City to close-out the project. Consultant shall <br />primarily assist City with closing out yet to be resolved Potential Contract Change Orders(CCOs) with the <br />Contractor. Consultant shall prepare for and attend at least one project management (PM) level CCO <br />meeting every week. Consultant shall also assist the City to prepare for and attend one Executive level <br />CCO meeting every month. Additionally, Consultant shall assist the City with interpreting provisions of the <br />construction documents for clarity when requested, etc. <br />Assumptions: <br />City will lead all project closeout tasks. The consultant shall provide support when requested by the City. <br />Task 2 - Record Drawings (Carry -Over Task from Expired CSA) <br />Consultant shall prepare record drawings of the project to incorporate changes made during the <br />construction period. Consultant and Consultant's project architect shall prepare record drawings using <br />Consultant's standard format to include changes made during the construction period. <br />Information Provided by City: <br />Consulting Services Agreement between Project No. 08-593-52-239 <br />City of San Leandro and Carollo Engineers, Inc. Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.