My WebLink
|
Help
|
About
|
Sign Out
Home
4A Public Hearings 2016 1121
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1121
>
4A Public Hearings 2016 1121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2016 5:07:38 PM
Creation date
11/16/2016 5:07:30 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/21/2016
Retention
PERM
Document Relationships
Reso 2016-153
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
grade, where the effective prestress in the concrete is less than 150 psi (1.03 Mpa). <br /> <br />1. Concrete foundation walls constructed in accordance with Table 1807.1.6.2. <br /> 2. Concrete patios, driveways and sidewalks, on grade. <br /> <br />Section 7-5-170: STRUCTURAL OBSERVATIONS FOR SEISMIC RESISTANCE <br /> Section 1704.6.1 of the 2016 Edition of the California Building Code is amended by adding new item 6 and exception to read as follows: <br />6. Structural observations of the lateral system shall be provided for all new commercial, <br />industrial, and multifamily buildings and all new single family dwelling on hillsides. <br /> Exception: Structural observations of the lateral system may be waived for one and two-story wood residential structure when such structures are in full compliance with conventional light frame <br />construction of Chapter 23 of the California Building Code or the California Residential Code. <br /> <br />SECTION 7-5-175: SOILS AND FOUNDATIONS Sections 1803.8, 1803.9 and 1803.10 are added to the 2016 California Building Code to read: <br /> <br />1803.8 Review. Before issuing a permit for a building where soil and foundation investigation is <br />required, the Geotechnical Engineer or Civil Engineer in responsible charge of the soil investigation shall state in writing (must be signed and stamped): <br /> <br />1. The plans and specifications substantially conform to the recommendations in the soil <br />investigation. <br />2. The Geotechnical Engineer or Civil Engineer in responsible charge of the soil investigation has been retained to provide soil site observation and provide periodic and final reports to the city. <br /> 1803.9 Field Report. Before requesting a foundation inspection from the City, the Geotechnical <br />Engineer or Civil Engineer in responsible charge of the soil investigation shall provide a written field <br />report stating: 1. The building pad was prepared and compacted in accordance with the soil report and <br />specification. <br />2. The foundation or pier excavation, depth, backfill materials, and drainage (if applicable), <br />substantially conforms with the soil report and approved plans. <br /> 1803.10 Final Report. Before final inspection for any building or structure, the Geotechnical <br />Engineer or Civil Engineer in responsible charge of the soil investigation shall issue a final report <br />stating the completed pad, foundation, finish grading, drainage, and associated site work <br />substantially conforms to the approved plans, specifications, and investigation. <br /> SECTION 7-5-180: CONCRETE AND MASONRY FOUNDATION WALLS <br /> <br />Section 1807.1.6 of the 2016 Edition of the California Building Code is amended to read as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.