Laserfiche WebLink
File Number: 16-629 <br />notified in writing by the owner if the registered design professional in responsible charge is <br />changed or is unable to continue to perform the duties. <br /> <br />The registered design professional in responsible charge shall be responsible for reviewing and <br />coordinating submittal documents prepared by others, including phased and deferred submittal <br />items, for compatibility with the design of the building. <br /> <br />Where structural observation is required by Section 1704, the statement of special inspections <br />shall name the individual or firms who are to perform structural observation and describe the <br />stages of construction at which structural observation is to occur (see also duties specified in <br />Section 1705). <br />107.3.4.2 Deferred submittals. <br /> <br />For the purposes of this section, deferred submittals are defined as those portions of the design <br />that are not submitted at the time of the application and that are to be submitted to the Building <br />Official within a specified period. <br /> <br />Deferral of any submittal items shall have the prior approval of the Building Official. The registered <br />design professional in responsible charge shall list the deferred submittals on the construction <br />documents for review by the Building Official. <br /> <br />Documents for deferred submittal items shall be submitted to the registered design professional <br />in responsible charge who shall review them and forward them to the Building Official with a <br />notation indicating that the deferred submittal documents have been reviewed and been found to <br />be in general conformance to the design of the building. The deferred submittal items shall not be <br />installed until the design and submittal documents have been approved by the Building Official. <br />107.4 Amended construction documents. <br /> <br />Work shall be installed in accordance with the approved construction documents, and any <br />changes made during construction that are not in compliance with the approved construction <br />documents shall be resubmitted for approval as an amended set of construction documents. <br /> <br />107.5 Retention of construction documents. <br /> <br />One set of approved construction documents shall be retained by the Building Official for a period <br />of not less than 180 days from date of completion of the permitted work, or as required by state or <br />local laws. <br /> <br />SECTION 108 <br />TEMPORARY STRUCTURES AND USES <br /> <br />108.1 General. <br /> <br />The Building Official is authorized to issue a permit for temporary structures and temporary uses. <br />Such permits shall be limited as to time of service, but shall not be permitted for more than 180 <br />Page 14City of San Leandro Printed on 11/15/2016