My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2016 1121
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1121
>
8D Consent Calendar 2016 1121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2016 5:07:41 PM
Creation date
11/16/2016 5:07:41 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/21/2016
Retention
PERM
Document Relationships
Reso 2016-156
(Reference)
Path:
\City Clerk\City Council\Resolutions\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Meeting Date: November 21, 2016 <br />Staff Report <br />Agenda Section:File Number:16-559 CONSENT CALENDAR <br />Agenda Number:8.D. <br />TO:City Council <br />FROM:Chris Zapata <br />City Manager <br />BY:Keith Cooke <br />Engineering & Transportation Director <br />FINANCE REVIEW:David Baum <br />Finance Director <br />TITLE:Staff Report for a Resolution Accepting the Work for the Sanitary Sewer Line <br />Replacement/Repair 2012-13 Project, Project No. 2013.0120 <br />SUMMARY AND RECOMMENDATIONS <br />Staff recommends that the City Council accept the work by Con-Quest Contractors, Inc. for <br />the Sanitary Sewer Line Replacement/Repair 2012-13 Project and authorize the City Manager <br />to file the Notice of Completion, release the performance and payment bonds, and release the <br />maintenance bond upon successful completion of the one-year maintenance period. <br />BACKGROUND <br />The subject project replaced approximately 2,200 linear feet of pipe of various sizes, built or <br />reconstructed 26 manholes, along with other miscellaneous repair items as identified on the <br />project plans. These improvements increased the sanitary sewer system’s reliability, reduced <br />the frequency of required maintenance, reduced the risk of sewage overflows and improved <br />system access and efficiency of maintenance operations. <br />Composite non-metallic manhole frames and covers were installed on a trial basis at several <br />locations where sewer gases have corroded the existing metal frames and covers; the <br />performance of these items will be monitored. The non-metallic manhole frames and covers <br />are lighter than their metal counterparts, are unattractive to metal thieves, and are corrosion <br />resistant. The composite covers have locks operable only with special tools to deter <br />unauthorized access. <br />Analysis <br />On April 20, 2015 the City Council awarded the construction contract for the subject project to <br />Con-Quest Contractors, Inc. Construction is complete. The work was inspected and deemed <br />to comply with the contract documents and City standards. <br />Page 1 City of San Leandro Printed on 11/16/2016
The URL can be used to link to this page
Your browser does not support the video tag.