EXHIBIT A <br />SCOPE OF SERVICES <br />Project Description <br />The Consultant shall prepare construction -ready plans, specifications and cost estimates (PS&E) for the <br />Police Building and South Offices Modifications Project based on the conceptual plan and Facilities <br />Assessment Report that resulted from the Space Planning for Police Department Expansion into South <br />Offices and Dispatch Center Expansion Project completed in 2014. <br />This renovation project involves relocating non-essential functions from the existing Public Safety Building <br />to the South Offices Building. Approximately 7,000 SF of existing space of the South Offices Building will <br />be improved to house the Traffic Division, Records Division, and several sections of the Criminal <br />Investigations Division. The vacated areas of the existing Public. Safety Building will be reconfigured to <br />house an expansion of the Communications Division and supporting spaces, improving roughly 3,900 SF of <br />existing space. <br />The Consultant shall evaluate the condition of the HVAC system, electrical system, telecom system, <br />lighting, fire alarm system, sprinkler system, security system and standby generators for both buildings. <br />Improvements shall be designed to meet current code requirements, recommendations from the 2014 <br />Facilities Assessment Report, and the needs of the San Leandro Police Department. The design scope of <br />work will include, but is not limited to, adding a gym and locker rooms in the South Offices Building; moving <br />the Uninterruptible Power System from the server room in the South Offices to the Public Safety Building; <br />expanding the server room in the Public Safety Building; miscellaneous site improvements within the Civic <br />Plaza area in front of the Public Safety Building for accessibility and aesthetic purposes; and security gate <br />and fencing to the south of the South Offices Building. <br />Modifications to the conceptual design will be made under Task 1, Final Design Confirmation. Every <br />improvement considered will be evaluated based on public safety functionality, security, cost, and life cycle <br />cost assessment (LCCA). The design shall meet all State Building Code and regulatory requirements, <br />including those for Essential Services Buildings when applicable, in the most direct and cost-effective <br />manner possible. Consultant shall employ an "extended survivability" design approach that is specifically <br />geared to provide a level of emergency preparedness beyond code minimums. <br />Design of the project shall not exceed the construction cost budget of $4,436,000 (for building <br />improvements site work and indirect costs) by more than 4%. <br />Task 1 — Final Design Confirmation <br />Conduct kick-off meeting with all involved City staff including those from the Police Department, Public <br />Works maintenance, and Information Services. Review elements of the conceptual design and discuss any <br />changes required to meet current needs and conditions including, but not limited to: 1) providing a traffic <br />window to the new public lobby in the South Offices and/or relocating the proposed traffic division closer to <br />the public counter; 2) relocating the new Live Scan room to the proposed easterly interview room in the <br />South Offices; 3) removal of the wall between the break room and the kitchen in the South Offices; 4) have <br />proposed exercise and locker rooms accessible to all City staff and 5) additional tenant improvements to <br />the theater space (use to be determined). <br />Consulting Services Agreement between City of San Leandro and 10/3/2016 <br />Indigo Hammond + Playle Architects for Police Bldg. & So. Offices Modifications Exhibit A — Page 16 of 27 <br />