My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2016-145
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2016
>
Reso 2016-145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2017 4:46:37 PM
Creation date
11/17/2016 10:03:27 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
11/7/2016
Retention
PERM
Document Relationships
_CC Agenda 2016 1107 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 1107
8I Consent 2016 1107
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2016\Packet 2016 1107
Agmt 2016 Indigo Hammond + Playle
(Attachment)
Path:
\City Clerk\City Council\Agreements\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
designated material, product, thing, or service by specific brand or trade name unless the specification is <br />followed by the words "or equal" so that bidders may furnish any equal material, product, thing, or service. <br />All work shown on the plans and specifications shall conform with the City of San Leandro Standard Plans, <br />if applicable. Door hardware shall conform with City of San Leandro standard door hardware specification <br />guidelines. <br />Structural design shall be in accordance with the current CBC and SEAONC blue book. Where conflicts <br />exist, the more stringent requirements shall control the design. Structural calculations shall be provided for <br />the design of the vertical and lateral force resisting systems. <br />Deliverables Format <br />Final design confirmation plans: PDF <br />Meeting notes: PDF <br />60%, 90% and Final Plans: PDF and AutoCAD format. All xref drawings, pen -setting files, attached <br />images, fonts, and other files associated with the AutoCAD files shall also be sent to the City to allow for <br />accurate plotting of the drawings. Drawings shall be on the City standard title block. <br />Final Plans: Provide two wet -signed full-sized hardcopies in addition to the electronic files <br />60%, 90% and Final cost estimates: Microsoft Excel. Cost estimates shall break down the scope of work in <br />sufficient detail to allow City staff to verify the cost of the individual work items <br />60%, 90% and Final project technical specifications: Microsoft Word. The front end specifications will be <br />prepared by the City. <br />Excluded Services <br />The following items are excluded from the scope of work unless noted as included, but are available on the <br />basis of additional services should they become required and as approved by the City of San Leandro: <br />• Hazmat assessment (City to provided separately) <br />• Sprinkler system design (design -build by contractor) <br />• Bidding and construction management services. <br />• Civil Engineering and Landscape architecture services. <br />• Hazardous material assessment and abatement planning. <br />• Coordination with City or its furnishings vendor is included, however furnishings design and <br />procurement are excluded and will be provided by the City or its furnishings vendor. <br />• Minor structural accommodations for the remodel area shall be included, however significant <br />structural renovations or seismic retrofit or analysis of building frame and lateral force pathways is <br />not included. <br />• Minor modification to building mechanical and electrical building systems for the remodel area shall <br />be included, however significant mechanical or electrical renovations to building central systems is <br />not included. <br />• Emergency generator and power system replacement is excluded. <br />Consulting Services Agreement between City of San Leandro and 10/3/2016 <br />Indigo Hammond + Playle Architects for Police Bldg. & So. Offices Modifications Exhibit A — Page 19 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.