My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent 2016 1219
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2016
>
Packet 2016 1219
>
8F Consent 2016 1219
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 3:00:48 PM
Creation date
12/13/2016 3:00:47 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/19/2016
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Review and approve shop drawings, samples and other data which the Contractor is required to submit, but <br />only for conformance with the design concept of the project and compliance with the information given in <br />the Construction Contract Documents. Such reviews and approvals or other action will not extend to <br />means, methods, techniques, sequences or procedures of construction or to safety precautions and <br />programs incident thereto. Budget for this task is based on up to two reviews for each submittal. Additional <br />reviews would be provided as additional services and should be charged to the contractor by the City. City <br />shall be responsible for final approvals and issuing all submittal reviews to the contractor. <br /> <br />5.03 Requests for Information (RFI’s) <br />The Consultant shall prepare necessary interpretations and clarifications of the Construction Contract <br />Documents in response to RFIs forwarded by the City. Responses shall be sent to the City and not to the <br />Contractor <br /> <br />5.04 Requests for Quotations (RFQ’s) <br />Prepare sketches and narratives for change order quotations of additional work as requested by the City. <br />Work also includes review of the contractor’s price proposals. <br /> <br />5.05 Change Orders <br />Not included. Construction bulletins, work directive changes and change orders shall be prepared by the <br />City. <br /> <br />5.06 Substitutions <br />Evaluate and determine the acceptability of substitute materials and equipment proposed by the Contractor <br />to the extent provided in the General Conditions of the construction contract. <br /> <br />5.07 Site Visits <br />Make eight visits to the site at intervals appropriate to the various stages of construction in order to observe <br />the progress and quality of the various aspects of the Contractor's work. Based on information obtained <br />during such visits and on such observations, Consultant will endeavor to determine, in general, if such work <br />is proceeding in accordance with the contract documents. <br /> <br />Deliverable shall be a site observation report for each site visit. <br /> <br />5.07A Well Construction Support Services <br />The Consultant shall provide support services for the construction of the well. Work shall include: <br /> <br />Pilot hole drilling observation – Observe the drilling of the pilot hole during critical times and document the <br />subsurface conditions. Geologically log samples of the cuttings take at 5-foot intervals by the driller. <br />Perform sieve analyses on selected samples to aid in the lithologic evaluation and to assist in confirming <br />screen slot-size in the production well. Following the completion of the pilot hole drilling, geophysical <br />logging will be performed in the pilot hole by a selected service company. The resulting logs will be <br />interpreted for a prognosis of water quantity and quality for the production well. <br /> <br />Production well design – Prepare final well construction diagram for the production well. Details shall <br />include completion depth, screen intervals, screen slot size, gravel pack gradation, and depth of seal for the <br />production casing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.