My WebLink
|
Help
|
About
|
Sign Out
Home
8E Consent 2017 0117
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0117
>
8E Consent 2017 0117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2017 7:02:54 PM
Creation date
1/10/2017 7:02:50 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
1/17/2017
Retention
PERM
Document Relationships
Reso 2017-008
(Amended by)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br />P a g e | 14 <br />Collection System Map <br />Each of the City’s 184 base maps are digitized and formatted into an ArcGIS based mapping <br />system. The Graphical Information System (ArcGIS) mapping system is linked to the Collection <br />Department CMMS program, a street directory, and TV inspection Records.The link allows the <br />map to be populated with key data such as pipe size and pipe length.Maps are continuously <br />updated by Engineering as new tracts are accepted,and map corrections are identified by the <br />collection crew based upon field observations. Information Services provides updated map pages <br />to all map holders on a regular basis. <br />Prioritized Preventive Maintenance <br />The crew is equipped with modern equipment, Including one Combo Truck, one Hydro, one <br />Rodder, one CCTV, one Tanker, one 1-ton dump, one pickup and one emergency response <br />trailer.The six man crew rotates on a seven day 24/7 standby schedule <br />Computerized Maintenance and Management System (CMMS) <br />ICOM3 is used to manage the collection system preventive maintenance program.Maintenance <br />planning and scheduling is used to establish annual and other periodic maintenance goals. These
The URL can be used to link to this page
Your browser does not support the video tag.