My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-008
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 2:01:24 PM
Creation date
1/24/2017 10:02:25 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
1/17/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0117 RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0117
8E Consent 2017 0117
(Amended)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0117
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />Sewer System Management Plan <br />Volume I <br />Metr�han .... <br />In[Hnilirndl <br />A"M <br />The City sets aside $1.5 million in the Water Pollution Control Division budget annually to <br />conduct point repairs and complete emergency repairs. <br />Manhole Inspections <br />Inspections conducted for manholes involve a visual assessment of the overall manhole condition <br />and observed deficiencies that could result in UL As part of the focused and cyclic cleaning <br />programs, City Collections staff visually inspects manholes for corrosion, debris or damage <br />around the base, cracks or holes, and condition of manhole steps. <br />Ratings applied to manhole investigations use the standards of the NASSCO Manhole Condition <br />Assessment Program (MCAP) for each of the manhole structure components including the rim <br />and lid, chimney/cone, bench and channel. Each component is rated as poor, fair, or good <br />condition as a gross determination of construction adequacy of the structure and its component <br />parts. <br />Detailed investigations of manhole condition follows at a time when a connecting line segment is <br />defined as a rehab project, and corrections needed to the manhole structure are then included as <br />part of the project work. <br />Pump Station Inspections and Assessment <br />Pump stations are inspected on a weekly basis. Weekly inspections include visual check of the <br />equipment, manual cycling of pumps, checking and cleaning floats, recording hour meter <br />readings, and cleaning off debris. <br />Pump stations are inspected extensively every year. Extensive maintenance includes cleaning out <br />of sump, and removing pumps for inspection and performing repairs if necessary. <br />Page 1 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.