Laserfiche WebLink
8 <br />Current FeeDescription Reference <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />4 Plumbing Permit (Continued) <br />Septic tank outfit complete ( installation or removal/abandonment), each $65.60 <br />Sewer extension, each $22.30 <br />Site sewer lateral between building and street main, new or repairs or <br />abandonment <br />$41.90 <br />Temporary privy or vault (chemical toilet), each $19.10 <br />Gray Water Systems (fee to cover review of plans and inspection of <br />the installed system) <br />$152.00 <br />Gas Piping and Oil Piping: <br />Minimum Fee (one or two outlets)$7.70 <br />Exemption: Inspection of installation of an earthquake gas shutoff valve No minimum gas piping and oil piping fee <br />Each gas outlet over two $4.40 <br />Each gas meter over one (same time and place)$5.70 <br />Gas line test, each test $15.40 <br />Fuel oil or liquefied petroleum gas storage tanks, demolition of new <br />tanks and piping to building, each <br />$8.40 <br />Clothes dryer – residential, each $9.90 <br />Clothes dryer – commercial, each $12.00 <br />Hot Water systems, piping and equipment: <br />Minimum fee (first device)$9.90 <br />Each additional device $12.60 <br />Boilers: All Sizes $79.10 <br />Solar system, including collectors, piping, tanks & exchanger, each $51.20 <br />Energy Conservation: review of plans and/or energy forms for all <br />buildings subject to the California Energy Commission’s conservation <br />regulations (when not covered by building permit) <br />Direct Cost (1) with a minimum charge of $66.00 <br />5 Heating, Ventilating and Air Condition or General Mechanical <br />Filing and Issuance Fee <br />Plan Check, when applicable Direct Cost (1) <br />For Construction and additions with valuations over $100,000 including all <br />HVAC, registers, ducts, gas line and vents. <br />10% of Building Permit Fee <br />Each register over two $3.20 <br />Heating, cooling and ventilating appliances: <br />Gravity or forced air furnace, each (including gas fireplace inserts)$16.40 <br />Residential air conditioning system $14.30 <br />Unit heater, each $14.30 <br />Recessed wall heater, each $14.30 <br />Suspended space heater, each $14.30 <br />Gas range – domestic, each $9.90 <br />Gas range – commercial, each $12.00 <br />Gas clothes dryer, domestic, each $9.90 <br />Gas clothes dryer, commercial, each $12.00 <br />Gas domestic refrigerator, each $9.90 <br />Conversion burner, each $12.00 <br />Circulating type room heater, each $12.00 <br />Industrial and commercial heating equipment, each $16.90 <br />Alterations or changes of any control system or ventilating system from <br />original installation <br />$14.30 <br />Small burner of not over 15,000 BTU per hour, steam table sterilizers, <br />laboratory burners, coffee urn burners, gas plates and similar devices, each <br />$9.90 <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />For the roughing in of sheet metal or approved circulating air pipe in connection with any heating or cooling system, including air inlet or outlet connections, <br />registers and diffusers: <br />$100.00 plus the amount shown for each heating, ventilating, and air <br />conditioning item of work and each general mechanical item of work <br />For steam or hot water heating piping and radiators, convectors, hot water panels, steam or hot water unit heaters, clothes pressing <br />machines of any type, and all connection to industrial and processing equipment: <br />Appendix A: 846