Laserfiche WebLink
9 <br />Current FeeDescription Reference <br />COMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) <br />5 Heating, Ventilating and Air Condition or General Mechanical (Continued) <br />Fans or blowers connected to any heating system which are not part of <br />the furnace, each <br />$9.90 <br />Commercial range hoods, including vent, each $37.00 <br />Flues: <br />Minimum (one or two flues)$11.50 <br />Each flue over two (each)$7.10 <br />Ventilating System for Kitchen, Bath, etc.: <br />Minimum (one or two systems)$11.50 <br />Each system over two $9.90 <br />General Mechanical: <br />Incinerators – domestic, each $16.70 <br />Incinerators – commercial/industrial, each $65.30 <br />Garbage chutes, each $21.50 <br />Fire dampers, each $9.90 <br />Smog control after burners, commercial/industrial, each system $44.50 <br />Refrigeration system – commercial/industrial, each system $56.80 <br />Condensate drain system, each inlet $4.40 <br />Boilers: <br />All sizes $79.10 <br />Heat pumps, each $25.60 <br />Cooling Systems: <br />To 100,000 BTU each $22.50 <br />Over 100,000 to 500,000 BTU, each $35.40 <br />Over 500,000 to 1,000,000 BTU, each $46.80 <br />Over 1,000,000 BTU, each $58.10 <br />Evaporative Cooler, each $23.40 <br />Industrial Processing Equipment: <br />Ovens, dryers, cookers, fryers, kettles, etc. each $37.00 <br />Industrial processing exhaust systems, each system $37.00 <br />Manufactured spray booths, each $37.00 <br />Energy Conservation: review of plans and/or energy forms for all buildings <br />subject to the California Energy Commission’s conservation regulations <br />(when not covered by building permit) <br />Direct Cost (1) with a minimum charge of $66.00 <br />6 Signs <br />Filing and Issuance Fee <br />1 to 2 signs (non electric, attached to building)$158.00 <br />3 to 4 signs (non electric, attached to building)$237.00 <br />5 plus signs (non electric, attached to building)$316.00 <br />Monument signs (each)$211.00 <br />Electric self-contained signs, initially installed bearing Underwriters’ label <br />of approval, each <br />$29.80 <br />Relocation or alteration of any sign electronically or mechanically, but not <br />including replacement of tubing, transformers and such parts subject to <br />failure; or shop inspection by the local inspection department in lieu of a UL <br />label (a local electrical inspection department label of approval shall be <br />required), each <br />$79.00 <br />7 Excavation and Grading <br />Minimum Fee <br />Plan Checking <br />(1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs <br />$100.00 plus fees shown below. Fees for sign permits are in <br />addition to any required electrical permit fees <br />$75.00 PLUS the fees shown in the fee schedule as adopted by the <br />City Council except that wherever an hourly rate is shown, the rate <br />shall be equal to the Direct Cost (1) or whichever is greater. <br />$75.00 PLUS the fees shown in the fee schedule as adopted by the <br />City Council except that wherever an hourly rate is shown, the rate <br />shall be equal to the Direct Cost (1) or whichever is greater. <br />Sign permit fees are flat rate as indicated below and based on all signs being on the same property and on the same permit. Rates include <br />review and inspection <br />Appendix A: 947