Laserfiche WebLink
Current FeeDescriptionProposed Fee ScheduleReferenceCOMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)Proposed Feesviii) Photovoltaic Systemsa) Residentiali) Up to 15kW$267ii) each additional kW over 15kW$15b) Commerciali) Up to 25kW$400ii) 26kW - 50kW$623iii) each additional kW (51kW - 250kW) $7ii) each additional kW over 250kW$5ix) SignsSign permit fees are based on all signs being on the same property and on the same permit.a) 1st Non-energized sign attached to building.$100b) each additional sign thereafter:$50c) Pylon sign, energized or not, each:$211d) Monument sign, energized or not, each$158f) Relocation or alteration of any sign electronically or mechanically, but not including replacement of tubing, transformers and such parts subject to failure; or shop inspection by the local inspection department in lieu of a UL label (a local electrical inspection department label of approval shall be required), each$79x) Demolitiona) Commercial/Residential Demolition up to 3,000SF$267b) Each Additional 10,000SF$178C. Plan Checking FeePlan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to the building permit fee and shall be as follows:i) Plan Check Fee, if applicable80% of building permit feeii) For Master Plans (i.e. identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issued at the same time)iii) Changes, revisions, or additions to plans previously checkediv) Additional plan review after the first re-checkv) Alternate Methods and Materialsvi) Energy Conservation - for all buildings and projects subject to the California Energy Commission’s conservation regulations20% of building permit feeA full plan checking fee shall be paid for each Master Plan when more than one building will be built and one-third (33%) of the full plan checking fee shall be paid for each production phase building at time of application.$178 per hour; 1 hour minimum charge$178 per hour; 1 hour minimum charge$178 per hour; 1 hour minimum chargeNote: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community Planning Fees, and other mandated fees shall not exceed amounts authorized via Government Code Section 66015. 1330