My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2017 0501
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0501
>
5A Public Hearings 2017 0501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 4:18:47 PM
Creation date
4/25/2017 4:16:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/1/2017
Retention
PERM
Document Relationships
Reso 2017-060
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Current FeeDescriptionProposed Fee ScheduleReferenceCOMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued)Proposed FeesD. Miscellaneous Feesi) Miscellaneous Inspectionsa) Fees for inspection not otherwise set forth hereinb) Fees for inspection conducted outside of normal business hoursii) Investigation Feesa) Investigation fee for work commenced without first obtaining permits as required by the San Leandro Municipal Code, whether or not a permit is subsequently issuedb) Investigation fee for conditions that are not in compliance with the San Leandro Zoning and/or Municipal CodesNote: Payment of any investigation fees does not exempt any person from compliance with all other provisions of applicable codes in the execution of the work nor from any other penalties prescribed by law.E. Other Fees and Charges (i) Technology Fee (ii) Community Planning Fee (for commercial, industrial & residential jt)0.3% of total valuation of construction (iii) Strong Motion Impact Fee: State mandated tax for the Seismic Safety Commission for seismic monitoring. -- Residential -- Commercial/Industrial (iv) Building Standards Commission (SB1473) Fee: State Mandated tax for Green Building Standards collected for the State by the City. (v) Exception to Noise Ordinance$448 (vi) Certificate of Occupancy (vii) Temporary Certificate of Occupancy per 30 days (viii) Certificate of Compliance: (ix) House Moving Permit (x) Microfilm Copies (xi) Photocopies$0.10 per page (xii) Microfilming of Permit and Plans includes imaging fee for fire permits: (For purposes of fee charges, each permit is considered a drawing) -- 8-1/2 x 11 or 11 x 14 drawings including fire permits$1.90 per sheet -- All other size drawings$2.10 per sheet (xiii) Appeals(1) Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs$178 per hour plus mileage; 1 hour minimum charge$1.20Direct Costs (1) $178 per hour; 1 hour minimum charge$178 per hour; 1 hour minimum charge$178 per hour; 1 hour minimum charge$178 per hour; 1 hour minimum charge$267 hourly rate; 2 hour minimum chargeUp to 3x permit fee; plus any required permit fee$178 per hour; 1 hour minimum charge6% of permit fee, minimum $6.20 per permit type0.0010 per $10.00 Valuation or fraction thereof with a $0.50 min. 0.0021 per $10.00 Valuation or fraction thereof with a $.50 min.All Residential, Commercial, and Industrial permits that use Valuation to determine permit fees: $1.00 per $25,000 valuation or fraction thereof with a $1.00 minimum. 1431
The URL can be used to link to this page
Your browser does not support the video tag.