My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2017 0501
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0501
>
5A Public Hearings 2017 0501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 4:18:47 PM
Creation date
4/25/2017 4:16:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
5/1/2017
Retention
PERM
Document Relationships
Reso 2017-060
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Current FeeDescriptionProposed Fee ScheduleReferenceCOMMUNITY DEVELOPMENT DEPARTMENT - Building Regulations Division (continued) 2Building Permit (Continued)G. Plan Checking (1) Residential Fire Sprinklers for 1 & 2 Family Dwelling New Construction. Effective January 1, 2011, fire sprinkler systems became mandatory in 1 and 2 family dwellings. The Division of Building and Safety will be reviewing and inspecting the installation of these systems. (2) In-house- During Regular Working Hours80% of the building permit feeFor Master Plans (i.e. identical buildings built by the same builder on the same lot or in the same tract and for which building permits are issues at the same time):Changes, revisions, or additions to plans previously checked.Direct Cost (1) - 1 hour minimum chargeOutside plan checking services as utilized at discretion of Building Official.Same as for In-house- During Regular Working HoursAdditional Plan Review after the first recheckDirect Cost (1) - 1 hour minimum per occurrence(3) In-house - outside of normal business hours when requested by Applicant(4) By Outside consultant, when requested by Applicant(5) Over the counter for small changes, revisions or additions, when requested by applicantDirect Cost (1), with minimum of one-half hour(6) Expedited Plan Check when requested by applicant & when plan reviewer is availableFull plan check fee plus one and one-half times Direct Cost (1)(7) Phased Plan check- when the foundation or another part of the building needs approval and permit issuance prior to the whole buildingOne and One-half (1-1/2) times the full plan check fee for the entire building (8) Alternate Methods and MaterialsDirect cost (1) 1 hour minimum charge (9) Energy Conservation: for all buildings subject to the California Energy Commission’s conservation regulations20% of Building Permits(10) California Health & Safety Code (CHSC), section 18949.29 fee applied to all projects requiring a "Building Permit".3Electrical PermitA. Filing and Issuance$100 plus the amount shown below for each electrical item B. Plan-Check, when applicableDirect Cost (1)For Construction and additions with valuations over $100,000 including all circuits, service and sub panels.13% of building permit fees All Electrical circuits$12.70 Trolley and plug-in type bus-ways, per linear foot$0.70 Lighting fixtures, brackets, pendants, cord drops, outlets, receptacles, switches and other lamp holding devices, each on existing circuits$1.50 Multi-outlet assemblies, light tracts, per linear foot$1.30 Temporary power service pole or pedestal, each$31.40 Temporary distribution system (for construction sites, Xmas tree lots, etc.), each$31.40 Service or Service Change:Services over 600 volts: Up to 200 amp, each$111.20 Over 200 amp, each$111.20 Services 600 volts or less, each Up to 200 amp capacity$38.30 Over 200 amp capacity$76.60 (1)Direct Cost = hourly personnel charge plus a factor of 100% for fringe benefits, overhead and indirect costs $527.00 flat fee to include plan review and inspection of residential fire sprinkler systems when installed in conjunction with new 1 & 2 family dwelling construction. Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to the building permit fee and shall be as follows:Circuits: Installation, replacement or alteration of each electrical circuit (includes related outlets, switches, receptacle and lighting fixtures): A full plan checking fee shall be paid for each Master Plan when more than one building will be built and one half (50%) of the full plan checking fee shall be paid for each building at time of application.5% of Building Permit Fee - For training and continuing education required by the CHSC § 18949.Same as for In-house- During Regular Working Hours PLUS overtime and overhead chargesEqual to In-house - During Regular Working Hours PLUS Consultant's fee as established by Agreement (contract) between City and Consultant 422
The URL can be used to link to this page
Your browser does not support the video tag.