My WebLink
|
Help
|
About
|
Sign Out
Home
5C Public Hearings 2017 0717
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0717
>
5C Public Hearings 2017 0717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 5:40:21 PM
Creation date
7/13/2017 5:40:19 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
Reso 2017-099
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
Reso 2017-100
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of San Leandro Heron Bay Maintenance Assessment District No. 96-3 Page 6 <br /> Trail Maintenance <br />City staff will hire a contractor to complete pavement repairs on two sections of the trail <br />between the foot bridge and San Lorenzo Creek where tree roots have damaged the <br />asphalt. The work will involve digging out small sections of pavement, trimming back tree <br />roots and installing new asphalt patches. <br /> Shoreline Signs, Parking and Accessible Walkway <br />In conformance with the City’s updated permit with the San Francisco Bay Conservation <br />and Development Commission (BCDC), wayfinding signage, parking, and an accessible <br />walkway will be installed for improved public access to the shoreline trail network. <br /> <br />Bench Replacement <br />As part of the upkeep of the district grounds, City staff completed the replacement of the <br />existing rotted wood benches along the pathway with durable concrete benches. This was <br />completed in Fiscal Year 2015/2016. <br /> Tide Gate Repair <br />City staff completed repairs to several of the tide gates including; reconnecting the flap <br />gates and the frames, replacing rotted sections of the drain pipes, reattaching the screen <br />latch connections, replacing damaged screen bars and screens, and installing associated <br />stainless steel lubrication tubings. These repairs were completed in Fiscal Year <br />2015/2016. Additional gates will be repaired this upcoming fiscal year. <br /> <br /> <br /> <br />227
The URL can be used to link to this page
Your browser does not support the video tag.