My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent Calendar 2017 0717
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0717
>
8D Consent Calendar 2017 0717
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 5:40:27 PM
Creation date
7/13/2017 5:40:24 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
Reso 2017-102
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and 07/17/2017 <br /> <br />Strategic Products and Services, LLC for Cisco Phone System Upgrade Exhibit A – Page 8 of 12 <br />o Note: Phones and side-cars will be configured “like-for-like” based on the Cisco <br />7911/7961/7941/7965/7916s currently used in production. <br />o Note: City of San Leandro is responsible for physical handset placement and disposal of retired <br />handsets. <br />• Configure [14] Cisco ATA190 devices with up to [28] analog ports <br />o Note: These analog ports will be configured “like-for-like” based on the FXS ports currently used <br />in production, terminated by ATA186s. The ATA186 analog gateways will no longer be utilized after <br />the migration to the new ATA190 devices. <br /> <br />Remote Assistance for Equipment Migration (After Hours): <br />• SPS will serve in an advisory role to oversee the following City of San Leandro IT led activities: <br />o Migrating WAN/Telco uplink connections from the existing routers to new routers during an <br />after-hours maintenance window. <br />o Handset replacement (swap-out) from existing handsets to new. <br />• SPS will stabilize and return the WAN in relation to the Point-to-Point connectivity handled by the <br />routers in this scope of work to previously operational state before the migration. <br />• SPS will perform testing and validation to state of previously operational voice services. <br />• Note: Service Provider coordination is not included in the scope of services and is not expected to be <br />required. SPS is not responsible for troubleshooting with Service Providers if WAN connectivity to said <br />providers after equipment migration is unavailable/down. <br /> <br />Testing, Cutover, and Day 1 Support: <br />• A standard test plan will be provided during phase I of this engagement. <br />• SPS engineers will work with City of San Leandro to include City of San Leandro specific testing criteria. <br />• Testing will be performed prior to and during system go-live. Not all items can be tested prior to go- <br />live and those items will be identified in the test plan. <br />• Complete final steps prior to cutover <br />• Perform Go-Live/Cutover and execute test plan during [1] planned maintenance window. <br />• SPS will provide [4] hours of Day 1 support remotely. Tasks include: <br /> o Troubleshoot and isolate any issues that arise during first day of system use. <br /> o Create punch list of items needing remediation that arose as part of final testing and/or day 1 <br />support. <br /> <br />Training: <br />• SPS will provide [2] hours of train-the-trainer training on the Imagicle Call Accounting (Billy Blue) <br />software. End-user guides from Imagicle will also be provided. <br />• SPS will provide [2] hours of administration training for the new Cisco UC environment. <br />• SPS will provide [2] hours of administration training for the handset migration of Cisco 7900 series <br />phones (7941/7961/7965) to Cisco 8851s. <br />• There is no formal training for end users included in this Statement of Work. <br /> <br />Deliverables: <br />Successful upgrade and migration of Cisco Unified Communications as well as migration to new router <br />platforms and Cisco handsets. <br /> <br />303
The URL can be used to link to this page
Your browser does not support the video tag.