Laserfiche WebLink
• Minor modification to building mechanical and electrical building systems for the remodel area shall <br /> be included, however significant mechanical or electrical renovations to building central systems is <br /> not included. <br /> • Emergency generator and power system replacement is excluded. <br /> • Preparation of CAD backgrounds for area of work based on as-built drawings provided by City and <br /> limited field reconnaissance is included, however extensive field measuring to document existing <br /> conditions is not included. <br /> • Agency or utility permitting plan check or review fees (to be paid by City) <br /> • Value engineering or constructability reviews conducted outside of A&E (architect&engineer) <br /> team. <br /> • Design of a project substantially exceeding the construction cost budget of$5,436,000 or <br /> substantially exceeding timeline stated above. <br /> • Printing and delivery will be charged as reimbursable expenses and are in addition to the basic <br /> scope fee amounts. <br /> Amendment No. 1 to <br /> Consulting Services Agreement between City of San Leandro and 4/4/2017 <br /> Indigo Hammond + Playle Architects for Police Bldg. & So. Offices Modifications Page 7 of 10 <br />