My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-102
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 1:51:35 PM
Creation date
7/20/2017 1:29:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0717 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
8D Consent Calendar 2017 0717
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
Agmt 2017 Strategic Products and Services, LLC for Cisco Phone System Upgrade Project
(Reference)
Path:
\City Clerk\City Council\Agreements\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Services and Deliverables <br />SPS will provide a Senior Level Engineer to act as lead and to plan, configure, install and test the outlined <br />solution. This lead engineer will have expertise in the architecture(s) scoped as part of this engagement. <br />Additional engineers may be assigned depending on the phase, required expertise, workload and status <br />of the project. <br />Phase I: Planning <br />Planning of the project by obtaining refined information and creating the plan for implementation and <br />the technical design to meet the project objectives. <br />• Hold kick-off meeting with the City of San Leandro and SPS project teams <br />• Establish the City of San Leandro project team including technical contacts and subject matter experts <br />• Identify and define the roles and responsibilities of each project team member <br />• Review project, including the Scope of Work, to establish any changes and/or additions to the scope, <br />requirements or deliverables <br />• Develop Project Plan including: <br />o Milestones and Timelines <br />o Reporting Requirements <br />o Communication Plans <br />o Risk and Change Management Plans <br />• Hold meetings to discuss the design objectives <br />• Perform data collection and discovery including the collection of available documentation regarding <br />the City of San Leandro current environment <br />• Obtain required administrative access to hardware and software in the City of San Leandro current <br />environment <br />• Obtain required remote access to the City of San Leandro environment <br />• Review tolerance for downtime and cutover scheduling for both during and after business hours <br />• Develop low level design document detailing the design objectives and detailed technical aspects of <br />the design including discovery data, diagrams and configurations <br />• Develop test and acceptance plan based on low level design <br />• Obtain written acceptance of design and design objectives <br />Deliverables: <br />Design documentation including an itemized list of design objectives and testing criteria. <br />Consulting Services Agreement between City of San Leandro and 07/17/2017 <br />Strategic Products and Services, LLC for Cisco Phone System Upgrade Exhibit A — Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.