Laserfiche WebLink
CITY OF SAN LEANDRO <br />RE: ExhibitA-CONSISTENCY MEMORANDUM FOR THE SLTC MIXED-USE PROJECT (PLN26-oo67) <br />JULY 27, 2017 <br />Pace u <br />ImpactsTable 3: Relevant Potential Project <br />.. tion Measures <br />Potential Impact <br />2002 General Plan Policies/Mitigation <br />Corresponding 2o26 General Plan <br />Compliance <br />Measures* and 2007 TOD Strategy.EIR <br />Policies/Mitigation Measures <br />Mitigation Measures <br />Implementation of <br />engineering and building standards, <br />review process, and its engineering and <br />minimize risks based on <br />the TOD Strategy <br />should ensure that new construction is <br />building standards, should ensure that <br />hazards. The project would <br />could result in <br />designed to minimize the potential for <br />new construction is designed to <br />be required to comply with <br />significant impacts <br />damage. <br />minimize the potential for damage. <br />the recommendations <br />related to expansive <br />• General Plan Action EH -1.1.A: <br />outlined in the geotechnical <br />soils. <br />Require soils and/or geologic <br />report, as a condition of <br />reports for development in <br />approval, for soil subgrade <br />preparation, soil subgrade <br />areas where potentially serious <br />stabilization, utilitytrench <br />geologic risks exist. These <br />backfill, exterior flatwork <br />reports should address the <br />subgrade preparation, vapor <br />degree of hazard, design <br />retarder, pavement design, <br />parameters for the project <br />rigid pavement, and non - <br />based on the hazard, and <br />vehicular concrete pavers, <br />appropriate mitigation <br />and seismic design. <br />measures. <br />Hazards and Hazardous Resources <br />Implementation of <br />General Plan Policy 33-02; Work with <br />General Plan Policy EH -5.2: Work with <br />The projectwould comply <br />the TOD Strategy <br />the appropriate county, regional, state, <br />the appropriate county, regional, state, <br />with Policy EH -5.3. to reduce <br />could result in <br />and federal agencies to develop and <br />and federal agencies to develop and <br />project impacts. Seethe <br />significant impacts <br />implement programsforhazardous <br />implement programsforhazardous <br />Hazards and Hazardous <br />through the routine <br />waste reduction, hazardous material <br />waste reduction, hazardous material <br />Resources discussion below. <br />transport, use, or <br />facility siting, hazardous waste handling <br />facility siting, hazardous waste handling <br />The project would dispose of <br />disposal of <br />and disposal, public education, and <br />and disposal, public education, and <br />hazardous materials as <br />hazardous materials <br />regulatory compliance. <br />regulatory compliance. <br />required by all appropriate <br />orthrough the <br />agencies. <br />release of hazardous <br />General Plan Policy02: Ensure that <br />33 <br />General Plan PolicyEH-5.2: Ensure that <br />5 <br />The project would comply <br />materials into the <br />the necessary steps are taken to clean <br />the necessary steps are taken to cleanup <br />with Policy EH -5.2 to reduce <br />environment. <br />up residual hazardous wastes on any <br />residual hazardous wastes on any <br />project impacts. Seethe <br />contaminated sites proposed for <br />contaminated sites proposed for <br />Hazards and Hazardous <br />redevelopment or reuse. <br />redevelopment or reuse. Require soil <br />Resources discussion below. <br />evaluations as needed to ensure that <br />The project would dispose of <br />risks are assessed and appropriate <br />hazardous materials as <br />remediation is provided. <br />required by all appropriate <br />agencies. <br />General Plan Policy 33.03: Require that <br />General Plan Policy EH -5.3: Require <br />The project would <br />all hazardous material storage and <br />that all hazardous material storage and <br />implement Policy EH -5.3 to <br />handling areas are designed to minimize <br />handling areas are designed to minimize <br />reduce project impacts. See <br />the possibility of environmental <br />the possibility of environmental <br />the Hazards and Hazardous <br />contamination and adverse off-site <br />contamination and adverse off-site <br />Resources discussion below. <br />impacts. <br />impacts. Enforce and implement <br />The project would dispose of <br />relevant state and federal codes <br />hazardous materials as <br />