My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-096
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 1:52:30 PM
Creation date
7/24/2017 1:09:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0717 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
5A Public Hearings 2017 0717
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SAN LEANDRO <br />RE: Exhibit A -CONSISTENCY MEMORANDUM FOR THE SLTC MIXED-USE PROJECT (PLN3.6-oo67) <br />JULY 17, 203.7 <br />Paae 16 <br />ENVIRONMENTAL CONSISTENCY REVIEW <br />TOD Buildout Strategies <br />Full buildout under the TOD EIR includes public improvements to infrastructure, civic building projects <br />and private sector sponsored residential, commercial and other developments. <br />The TOD Strategy aims to stimulate new development within Downtown San Leandro's existing context <br />and: <br />• Capitalize on the existing and planned transit infrastructure; <br />• Improve transit ridership; <br />• Provide a diversity of housing choices; <br />• Infill the areas located on the periphery of the downtown core with a rich diversity of mixed-use <br />projects; <br />• Extend the existing mixed-use downtown area westwardtothe Washington Avenue corridorand <br />the Washington Plaza shopping center; <br />• Develop the vacant land and replace the warehouse buildings around the existing BART station <br />to maximize the transit ridership potential of the land; <br />• Strengthen and help ensure the success of that transit infrastructure; and <br />• Be sensitive to the existing context of the downtown and its surrounding neighborhoods. <br />The proposed project would develop vacant land with residential and commercial land uses adjacent to <br />the Downtown San Leandro BART station, which would capitalize on the existing transit infrastructure, <br />provide housing choices, and infill the downtown core. Therefore, the project is consistent with TOD <br />BART Area Mixed -Use goal strategies identified in the TOD EIR. <br />TOD Strategy Growth Projections <br />The TOD Strategy proposes the following growth projections, shown below in Table 4. <br />Table 4 <br />TOD Strategy Growth Projections <br />Land Use Type <br />Square Footage <br />Housinq Units <br />Residential <br />N/A <br />3,431 <br />Office <br />718,240 <br />N/A <br />Retail/Commercial <br />l2to,870 <br />N/A <br />Total <br />839,13.0 <br />3,431 <br />Source: San Leandro TOD EIR 2007. <br />
The URL can be used to link to this page
Your browser does not support the video tag.