My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-096
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 1:52:30 PM
Creation date
7/24/2017 1:09:12 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 0717 CS + RG
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
5A Public Hearings 2017 0717
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 0717
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
multi-level parking structure. The project provides in -fill housing on property that is within <br />walking distance to downtown retail services, AC Transit and BART transit stops, and nearby <br />office building including the SLTC buildings. The development expresses strong and attractive <br />contemporary architecture, with bold forms and durable, high quality materials that, together <br />with the rest of the San Leandro Tech Campus (SLTC), achieves the vision in the TOD <br />Strategy for downtown San Leandro as a desirable place to live and work. The proposed <br />project also provides needed new housing supply in the City and helps the City to meet its <br />State Regional Housing Needs Allocation Housing goals, particularly under its Housing <br />Element. The north will be developed with the SLTC and the south is existing industrial uses. <br />These existing conditions have no adjacent development or persons residing adjacent to the site <br />that would be affected by the multi -story development and related site improvements. <br />3. That the proposed use will comply with the provisions of this code; including any specific <br />condition required for the proposed use, in the district, in which it would be located. <br />The Planned Development provides a mechanism for reviewing and considering that the <br />development project is designed to be compatible with the application of careful and <br />imaginative architectural treatment. The review allows the City to ensure orderly and thorough <br />planning that will result in high—quality urban design. The appropriate conditions of approval <br />will ensure the proposed use will comply with the code. <br />4. That the proposed use will not create adverse impacts on traffic or create demands <br />exceeding the capacity of public services and facilities, which cannot be mitigated. <br />Adequate on-site parking will be provided for the mixed-use residential building containing <br />13,000 square feet of speculative office space and 197 apartment units. In the DA District, the <br />commercial office parking requirement is two spaces per 1,000 square feet (26 spaces required) <br />and multi -family residential adjacent to BART is one space per unit (197 spaces required). The <br />total required is 223 spaces. The proposed project would have 229 spaces to satisfy the <br />requirement. This includes 81 parking spaces in the ground floor parking garage in the mixed- <br />use building and 144 spaces in the adjacent Phase II garage parking structure on Parrott Street, <br />accessible both from grade and from the pedestrian bridge on Level 2 linking the two <br />structures. There would be 26 spaces available on the ground floor and 118 spaces in the Phase <br />II parking structure Levels 3 and 4. <br />The Traffic Study (Study) prepared by Kimley Horn, dated February 23, 2017, identified <br />several significant impacts and recommended corresponding mitigation measures. First, the <br />Study identified an impact at the intersection of Thornton Street and San Leandro Boulevard. A <br />recommended condition of approval is that the Developer construct a traffic signal at the <br />intersection of Thornton Street and San Leandro Boulevard, as recommended in the Study. The <br />new signal must be interconnected with the nearby signals along San Leandro Boulevard. <br />In addition, the Study identified an impact at the intersection of Parrott Street and San Leandro <br />Boulevard. A recommended condition of approval is that the Developer re -stripe eastbound <br />Parrott Street to have an eastbound left turn lane and a shared eastbound through and right turn <br />lane, as recommended in the traffic study. This will require the roadway be widened to <br />accommodate the third traffic lane for fire equipment to make the southbound right tum <br />movement from San Leandro Boulevard, and will require modifications to the existing traffic <br />signal. Moreover, the recommended condition requires the Developer to re -stripe westbound <br />Recommended Findings of Fact July 17, 2017 <br />PLN16-0067 Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.