My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 1998-008
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
1998
>
Reso 1998-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 10:30:19 AM
Creation date
8/2/2017 10:41:56 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
1/5/1998
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sole and final judge, determines that such construction activities will generate pollutant bearing <br />runoff; erosion and/or sedimentation; or will in any way threaten the wetland areas adjacent to, or in <br />proximity of, the subdivision. <br />(d) Subdivider agrees to take all steps necessary to mitigate the potential generation of air- <br />borne dust or debris during the performance of the work hereunder. Subdivider fiu Cher agrees that <br />the City Engineer, as the sole and final judge, may order all or any portion of the work to be <br />suspended in the event air -borne dust or debris leaves the work area and causes a nuisance to <br />adjoining property owners or the public at large. Such suspensions shall remain in effect until the <br />City Engineer is fully satisfied that the work practices causing the air -borne dust or have been <br />satisfactorily mitigated and the adversely affected properties or areas have been thoroughly cleaned. <br />(e) Construction activity shall not commence prior to 7:00 a.m. and shall cease by 6:00 <br />p.m., unless otherwise approved by the Director of Planning and Building. There shall be no <br />construction activity on Sundays. <br />(f) Truck hauling activities shall be restricted to 8 a.m. - 5 p.m. There shall be no truck <br />hauling activity on Sundays. <br />(g) The contractor shall be required to employ the quietest among alternative equipment <br />or to muffle/control noise from available equipment. <br />(h) Insofar as possible, noisy operations shall be performed off-site or on portions of the <br />site distant from residential neighborhoods. <br />(i) All construction contracts shall include the following requirements: 1) Unpaved <br />construction sites shall be sprinkled with water at least twice per day, 2) trucks hauling <br />construction materials shall be covered with tarpaulins or other effective covers, 3) streets <br />CAMAPS\PM6662\SUBIWAG.DOC <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.