Laserfiche WebLink
f. <br />surrounding demolition and construction sites shall be swept at least once per day, and 4) paving <br />and planting shall be done as soon as possible. City shall charge applicant, and applicant shall pay, <br />for all costs of sweeping city streets in the vicinity of the project as necessary to control dust and <br />spillage. <br />0) All construction contracts shall include requirements that construction equipment <br />avoid unnecessary idling to reduce CO, ROG and NOX emissions. <br />(k) In the event that archaeological or historical resources are discovered during <br />excavation/grading, work shall be suspended and a qualified archaeologist or historian shall be <br />hired at Subdivider's expense to examine the findings and to recommend appropriate mitigation. <br />Said mitigation shall be reviewed and approved by the Planning Commission and City Council. <br />(1) All fill material imported to the project site shall be tested for toxicity. The <br />applicant shall submit the results of such testing to the City. Fill material which has toxicity levels <br />in excess of permissible local, state or federal levels shall not be used on the project site. <br />(m) All metal fences and ancillary structures in the right-of-way and in close proximity <br />to the transmission lines shall be grounded, in accordance with applicable specifications, to <br />eliminate potential electric shocks. Appropriate cautionary signing shall also be installed. <br />C:\MAPS\PM6662\SUBHAPAG.D0C <br />It -1 <br />CITY OF SAN LEANDRO, a municipal <br />corporation <br />By: <br />JOHN J. JERMANIS <br />City Manager <br />