Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
2017 Street Projects <br />Phase 1 of the 16-17 Overlay / Reconstruction Project <br />will start construction in September. <br />Contractor is DeSilva Gates. Contract Value is $3.0M . <br />Funded by Measure BB and HH <br />This package includes the following <br />PHASE 1 <br />Mill and Fill Streets <br />Street Name Start Location End Location <br />1Estabrook Street East 14th Street Washington Avenue <br />2Fairbanks Street Barrow Street Sitka Street <br />3Longview Drive Astor Drive Skyview Drive <br />4O'Donnell Avenue Reynolds Street Grover Cleveland Park <br />5San Leandro Boulevard North City Limits San Leandro Creek <br />6Teagarden Street Alvarado Street 1000' w/o Alvarado <br />4146