Laserfiche WebLink
2017 Street Projects <br />Phase 2 of the 16-17 Overlay / Reconstruction will start construction in Spring 2018 <br />Expecting a bid of approximately $3.0M <br />PHASE 2 <br />Mill and Fill Streets <br />Street Name Start Location End Location <br />1Arena Street Laverne Avenue Elvina Drive <br />2Belleau Street Marne Street Maureen Street <br />3Del Mar Circle Portola Drive Cul de Sac <br />4Hesperian Boulevard Thornally Drive CV Freeway <br />5Marne Street Breckenridge Street Belleau Street <br />6Vining Drive Farnsworth Street Cranbrook Street <br />Reconstruction Streets <br />Street Name Start Location End Location <br />1Arena Street Mendocino Street Laverne Drive <br />2Kappa Avenue Laverne Drive Elvina Drive <br />5147