My WebLink
|
Help
|
About
|
Sign Out
Home
4C Presentations 2017 0905
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0905
>
4C Presentations 2017 0905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 5:05:04 PM
Creation date
8/28/2017 5:05:02 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/5/2017
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2017 Street Projects <br />Phase 2 of the 16-17 Overlay / Reconstruction will start construction in Spring 2018 <br />Expecting a bid of approximately $3.0M <br />PHASE 2 <br />Mill and Fill Streets <br />Street Name Start Location End Location <br />1Arena Street Laverne Avenue Elvina Drive <br />2Belleau Street Marne Street Maureen Street <br />3Del Mar Circle Portola Drive Cul de Sac <br />4Hesperian Boulevard Thornally Drive CV Freeway <br />5Marne Street Breckenridge Street Belleau Street <br />6Vining Drive Farnsworth Street Cranbrook Street <br />Reconstruction Streets <br />Street Name Start Location End Location <br />1Arena Street Mendocino Street Laverne Drive <br />2Kappa Avenue Laverne Drive Elvina Drive <br />5147
The URL can be used to link to this page
Your browser does not support the video tag.