o The actual cutover/migration of services will occur during maintenance windows planned for after <br /> business hours. <br /> __ • If testing results in the request of significant changes to the system design or configuration that is <br /> contrary to the signed design documents;this may be considered out of scope and require a project <br /> change order. <br /> • The migration will be performed as "like-for-like". Besides the specific tasks listed, no additional <br /> features and functionality are included in this proposal, including changes to existing data and dial plan. <br /> New features and/or re-configuration of the existing environment is not included unless specified in this <br /> proposal. <br /> Access <br /> • SPS will deliver engineering services for this project via remote access such as secure VPN. <br /> • City of San Leandro should plan on alternative internet access (for example,via 4G/LTE) during the <br /> cutover so that SPS can assist with configuration issues related to routing, etc. <br /> • No onsite visits will be required by SPS, and no travel costs will be charged. <br /> • City of San Leandro is responsible for racking equipment to be accessed remotely by SPS for <br /> configuration. <br /> • All Cisco Smartnet/SWSS contracts are have been purchased from SPS for equipment associated to this <br /> project in a separate bill of materials provided to City of San Leandro. <br /> • City of San Leandro will provide access to the equipment and the appropriate resources to assist with <br /> the services in this SOW. <br /> • City of San Leandro IT staff will be responsible for the following: <br /> o Initial configuration of server appliances and routers to allow for SPS remote access via VPN or <br /> similar remote access method such as WebEx <br /> o LAN/WAN equipment and QoS configurations <br /> o Site-to-site VPN connectivity and/or firewall configurations <br /> o Cabling, Rack and Stack, and Smart hands <br /> o DHCP Server functionality and/or TFTP DHCP scope option configurations <br /> o Modifying Windows Server DHCP scope(s)TFTP servers on appropriate network subnets <br /> o Modifying Cisco IP Communicator (CIPC)TFTP servers configured on clients. <br /> o Migrating connections from old routers to new routers <br /> o Physical handset placement and disposal of old equipment and endpoints <br /> o Sonus and/or Office365 configurations <br /> Equipment <br /> • City of San Leandro is responsible for LAN configurations for initial router connectivity. <br /> • City of San Leandro is responsible for physically moving cables during equipment cutover. <br /> • Any equipment not mentioned in this SOW is the responsibility of City of San Leandro. <br /> • City of San Leandro is responsible for providing a valid Cisco supported SUP server to backup CUCM <br /> and CER. SPS will provide the list of Cisco compatible SFTP servers for City of San Leandro led <br /> deployment on infrastructure separate from the Business Edition 6000 servers. Storing UC backups in a <br /> location separate from the UC environment is a best practice disaster recovery recommendation. <br /> Consulting Services Agreement between City of San Leandro and 07/17/2017 <br /> Strategic Products and Services, LLC for Cisco Phone System Upgrade Exhibit A— Page 11 of 12 <br />