Laserfiche WebLink
Note: Deploying the server infrastructure highly available across two locations assumes the following: <br /> 1. End-to-end round-trip time between servers to/from each location should not exceed 80ms. <br /> 2.A minimum of 3MB of dedicated bandwidth should be available for the communications channel <br /> between the servers to/from each location.This communication channel should also be QoS enabled to <br /> minimize delay and packet loss. <br /> Out of Scope <br /> • LAN/WAN QoS, LAN Switch, or Firewall configurations <br /> • Adjusting or net new CER/E911 Configurations such as adding Emergency Responder Locations (ERLs) <br /> or Emergency Locator Identifying Numbers (ELINs). <br /> • City of San Leandro is responsible for maintaining all ANI / Facility location information in City of San <br /> Leandro's Telco provider system for E911. SPS will validate 911 dialing patterns are migrated to the <br /> upgraded Communications Manager server but is not responsible for PSAP routing or the accuracy <br /> thereof;this is the responsibility of City of San Leandro and carrier. <br /> • SSO/SAML configuration or setup <br /> • User onboarding, adoption, or training services <br /> • Decommissioning or uninstallation of any legacy equipment. <br /> • Issuing or re-generating 3rd party certificates <br /> • CallRex Call Recording configuration and/or integration with CUCM. <br /> • Configuration and troubleshooting of pre-existing systems and applications in the environment <br /> including but not limited to: <br /> o Active Directory, Microsoft Exchange, 0365, DNS Servers,VMware,Compute and Storage. <br /> • Configuration and troubleshooting of network equipment, including but not limited to: <br /> o Switches, Firewalls,Sonus SBCs. <br /> • Configuration and troubleshooting of Quality of Service (QoS) in the pre-existing network. <br /> • Configuration changes and/or troubleshooting of end-user workstations, phones and tablets, including <br /> but not limited to compatibility issues, stability and performance. <br /> Change of Scope of Work / Change Control <br /> • Unless otherwise expressly agreed in the included scope of services, any subsequent hardware <br /> upgrades required to run new or updated software once the implementation services have been <br /> completed is outside the scope of services. <br /> • All services will be delivered as detailed within this scope of services.City of San Leandro may request <br /> additional Services that are not included in the original scope of services via the Change Request Form <br /> available from their SPS Project Manager. <br /> • City of San Leandro and SPS will jointly determine if these requests require a separate scope of <br /> services or if a Change Order addendum can be made to the current scope of services. Changes may <br /> result in additional fees and will be detailed in an SPS Change Order. <br /> Consulting Services Agreement between City of San Leandro and 07/17/2017 <br /> Strategic Products and Services, LLC for Cisco Phone System Upgrade Exhibit A—Page 12 of 12 <br />