My WebLink
|
Help
|
About
|
Sign Out
Home
8D Consent 2017 0918
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 0918
>
8D Consent 2017 0918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2017 3:43:55 PM
Creation date
9/12/2017 3:43:53 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
9/18/2017
Retention
PERM
Document Relationships
Reso 2017-126
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ALAMEDA CTC AXX-XXX <br />Agreement <br /> <br />B-1 <br />APPENDIX B <br /> PROJECT SCOPE <br /> <br />ALAMEDA CTC shall provide all Design and Construction Phase work required to implement the PROJECT in <br />the areas as prioritized below and within the PROJECT budget. <br />1st Priority Area: Northwest cloverleaf area bounded by I-880, Davis Street, and the <br />southbound loop on-ramp <br />2nd Priority Area: Southwest triangular area bounded by I-880, Davis Street, and the <br />southbound diagonal on-ramp <br />3rd Priority Area: Southeast triangular area bounded by Davis Street, the northbound <br />cloverleaf on-ramp, and the abutting neighborhood to the south <br />Design Phase work to be performed includes but is not limited to: <br />• Design (Alameda CTC consultant) <br />• Project management (Alameda CTC staff) <br />• Advertising cost and bid support (Alameda CTC staff and consultant) <br />Construction Phase work begins with PROJECT award and includes but is not limited to: <br />• Design support during construction (Alameda CTC consultant) <br />• Construction inspection and management (TBD) <br />• Construction Contract (Contractor) <br />• Project management (Alameda CTC staff) <br />Plant Establishment work begins with acceptance of Construction completion and includes but is not limited <br />to: <br />• Plant establishment (1-3 years, dependent upon Caltrans requirements) <br />• Project oversight <br /> <br /> [Drawings on the next page]
The URL can be used to link to this page
Your browser does not support the video tag.