My WebLink
|
Help
|
About
|
Sign Out
Home
Ord 2017-015
CityHall
>
City Clerk
>
City Council
>
Ordinances
>
2017
>
Ord 2017-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2017 5:10:01 PM
Creation date
9/25/2017 11:21:45 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Ordinance
Document Date (6)
9/18/2017
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Specific adverse impact means a significant, quantifiable, direct and unavoidable impact, <br /> based on objective, identified and written public health or safety standards, policies or <br /> conditions as they existed on the date the application was deemed complete. <br /> Sec. 7-5-1510 Expedited permitting process. <br /> The Building Official shall implement an expedited, streamlined permitting process for electric <br /> vehicle charging stations consistent with this article, and adopt a checklist of all requirements <br /> with which electric vehicle charging stations shall comply with in order to be eligible for <br /> expedited review. The expedited, streamlined permitting process and checklist may refer to the <br /> recommendations contained in the most current version of the "Plug-In Electric Vehicle <br /> Infrastructure Permitting Checklist" of the "Zero-Emission Vehicles in California: Community <br /> Readiness Guidebook" as published by the Governor's Office of Planning and Research. The <br /> City's adopted checklist shall be published on the City's website and shall be accessible to the <br /> public. <br /> Sec. 7-5-1515 Permit application processing. <br /> A. Prior to submitting an application for processing, the applicant shall verify that the <br /> installation of an electric vehicle charging station will not have specific, adverse impact to public <br /> health and safety and building occupants. Verification by the applicant includes, but is not <br /> limited to, inspection of the following: electrical system capacity and loads; electrical system <br /> wiring, bonding and overcurrent protection; building infrastructure affected by charging station <br /> equipment and associated conduits; and areas of charging station equipment and vehicle parking. <br /> B. A permit application that satisfies the information requirements in the City's adopted <br /> checklist shall be deemed complete and be promptly processed. Upon confirmation by the <br /> Building Official that the permit application and supporting documents meet the requirements of <br /> the city's adopted checklist, and are consistent with all applicable laws and health and safety <br /> standards, the Building Official shall, consistent with Government Code Section 65850.7, <br /> approve the application and issue all necessary permits. <br /> C. Approval does not authorize an applicant to energize or utilize the electric vehicle <br /> charging station unless and until approval is granted by the applicable electric utility. <br /> D. An inspection may be required and performed by the Building Official. If an inspection <br /> is required, the inspection shall be done in an efficient and timely manner. If the electric vehicle <br /> charging station fails the initial inspection, a subsequent inspection may be required. <br /> E. If the Building Official determines that the permit application is incomplete, he or she <br /> shall issue a written correction notice to the applicant, detailing all deficiencies in the application <br /> and any additional information required to be eligible for expedited permit issuance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.