Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF SERVICES <br /> PROJECT BACKGROUND <br /> The City of San Leandro annually allocates funds toward street maintenance and rehabilitation. The total <br /> budget for the Annual Street Overlay/Rehabilitation 2017-18 Project, including design, construction, <br /> inspection, construction management, and contingency is$8,600,000. This project will involve extensive <br /> paving work on over 13 lane-miles on street sections comprised of 4 arterial streets, 5 collector streets, and <br /> 14 residential streets. Street sections included in the project are listed as follows: <br /> Arterial Streets <br /> Street Name Start Location End Location <br /> Lewelling Boulevard Nimitz Freeway Washin ton Avenue <br /> San Leandro Boulevard Coburn Court East 14th Street <br /> Marina Boulevard Marina Square Entrance Teagarden Street <br /> Washington Avenue* Anza Way 880 On/Off Ramps <br /> Washington Avenue 880 On/Off Rams 880 Overcrossin <br /> 194' South of Lewelling <br /> Washington Avenue Boulevard San Lorenzo Creek <br /> * Consultant shall only perform Task 2: Pavement Rehabilitation Design on the segment, <br /> Collector Streets <br /> Street Name Start Location End Location <br /> **Aladdin Avenue Alvarado Street East to End (Cul de Sac) <br /> Davis Street Doolittle Drive West to End (Cul de Sac) <br /> Farallon Drive Lot#2013 Wicks Boulevard <br /> Teagarden Street Aladdin Avenue 1000 ft West of Alvarado Street <br /> West Broadmoor Boulevard San Leandro Boulevard East 14th Street <br /> ** City will provide existing plans, specifications, and engineer's estimate for the segment. Consultant <br /> shall incorporate the segment into the Final PS&E package based on the existing PS&E. <br /> Residential Streets <br /> Street Name Start Location End Location <br /> 136th Avenue Bancroft Avenue End East of School Street <br /> Burroughs Avenue Wicks Boulevard Griffith Street <br /> Durant Avenue East 14th Street Myers Court <br /> Edison Avenue WhitneyStreet McCormick Street <br /> Cul de Sac West of Golden <br /> Greer Avenue Cul de Sac East of Golden Gate Gate <br /> Golden Gate Drive Faro Avenue Greer Avenue <br /> Consulting Services Agreement between City of San Leandro and <br /> NCE for Annual Street Overlay/Rehabilitation 2017-18 Project Exhibit A—Page 1 of 8 <br />