My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt 2017 DeSilva Gates Construction, LP for Project 2017.0050
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2017
>
Agmt 2017 DeSilva Gates Construction, LP for Project 2017.0050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2017 3:21:54 PM
Creation date
9/27/2017 3:21:46 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
7/17/2017
Retention
PERM
Document Relationships
Reso 2017-112
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated <br /> Item UNIT Price TOTAL <br /> Item Unit of Item UNIT Price PRICE <br /> No Description Quantity Measure (in Words) (in Figures) (in Figures) <br /> (A) (B) (AxB) <br /> 16. Adjust PG&E Gas Valve 15 EA Not Used $0.00 $0.00 <br /> lids to Grade per Section <br /> 301-1.6 <br /> 17. AC Milling and Offhaul 2,618 'IN Forty-Five Dollars $45.00 $117,810.00 <br /> (Final Qty) per Section <br /> 302-1 <br /> 18. AC Milling and Offhaul w/ 7,111 TN Fifty-Five Dollars $55.00 $391,105.00 <br /> Petromat(Final Qty) per <br /> Section 302-1 <br /> 19. Remove and Offhaul Base 280 TN Eighty Dollars $80.00 $22,400.00 <br /> Material per Section 300-2 <br /> 20. Compact Existing Street 31,003 SY Two Dollars $2.00 $62,006.00 <br /> Base per 301-2.3 <br /> 21. Aggregate Base per Section 280 TN Fifty Dollars $50.00 $14,000.00 <br /> 301-2 <br /> 22. Install Geogrid per Section 708 SY Two Dollars $2.00 $1,416.00 <br /> 300-10 <br /> 23. AC Paving per Section 302- 8,840 TN One Hundred Twenty $120.00 $1,060,800.00 <br /> 5 Dollars <br /> 24. RAC Paving per Section 889 TN One Hundred Thirty Dollars $130.00 $115,570.00 <br /> 302-9 <br /> 25. AC Digout Repairs per 344 TN Three Hundred Twenty-Five $325.00 $111,800.00 <br /> Section 302-3 Dollars <br /> 26. Install Pavement 22,967 SY Five Dollars $5.00 $114,835.00 <br /> Reinforcement Mesh per <br /> Section 302-14 <br /> 27. Replace Loop Detectors per I 1 EA Five Hundred Fifty Dollars $550.00 $6,050.00 <br /> Section 701-17.6 <br /> 28. Thermoplastic Stripes, 1 LS Thirty Thousand Dollars $30,000.00 $30,000.00 <br /> Pavement Markings, and <br /> Curb Painting per Section <br /> 314 <br /> 29. Standard 6-6" By 6-8" 22 EA Two Thousand Dollars $2,000.00 $44,000.00 <br /> Rubber Speed Cushion per <br /> City Std Plan 131 A/B <br /> 30. Standard 10'-6" By 6-8" 2 EA Three Thousand Dollars $3,000.00 $6,000.00 <br /> Rubber Speed Cushion City <br /> Std Plan 131 A/B <br /> 31. MUTCD Street Signage 4 EA Four Hundred Dollars $400.00 $1,600.00 <br /> (W13-1 "15MPH" /W17-1 <br /> "Speed Bump)per City Std <br /> Plan 131 A/B and 136 <br /> 32. Concrete Apron per City 176 SF Forty Dollars $40.00 $7,040.00 <br /> Standard Plan 114 and <br /> Section 303-5 <br /> 33. Install Detectable Warning 5 EA One Thousand Dollars $1,000.00 $5,000.00 <br /> Surface per City Std Plan <br /> 106D <br /> Last Revised: 06/01/16 Page 6 Agreement <br /> Annual Overlay/Rehabilitation 2016-17 Phase 1 Project No.2017.0050 <br />
The URL can be used to link to this page
Your browser does not support the video tag.