Laserfiche WebLink
vehicle parking spaces and said location of the spaces shall be distributed evenly on the <br /> site plan. <br /> G. Prior to issuance of building permits, a green building and water-efficient landscape <br /> checklist shall be completed and incorporated into building permits for this project. For <br /> --- ----- the—purposes of this condition,, the-checklists shall be-the-Build-it Green GreenPointRated---- <br /> checklist <br /> Rated -checklist for New Industrial Buildings, or an equivalent rating system, as approved by the <br /> Zoning Enforcement Official, and the StopWaste.Org Bay-Friendly Landscape checklist. <br /> H. Prior to issuance of a building permit for Building 1, the applicant and architect shall <br /> provide a revised wireless communications facility tower design that identifies a <br /> decorative parapet or roof and a clock face on at least two sides of the tower feature. <br /> The final design of the wireless communications facility tower shall be reviewed and <br /> approved by the Zoning Enforcement Official prior to issuance of the building permit. <br /> I. Prior to issuance of a Certificate of Occupancy, the applicant shall provide the Planning <br /> Division with three final bound color copies of the final Sign Program as well as an <br /> electronic copy in PDF or similar format. Any minor changes or revisions to the Sign <br /> Program shall require approval by the Zoning Enforcement Official. Major Sign <br /> Program revisions or amendments shall be referred to the Site Development Sub- <br /> Commission or Board of Zoning Adjustments for consideration. <br /> J. Security guard kiosks for entrances on Halcyon Drive and Washington Avenue may be <br /> submitted and approved by separate building permit. The design of the security booths <br /> may include a restroom and shall be consistent with the architecture of the other <br /> buildings on the property. <br /> V. ENGINEERING AND TRANSPORTATION DEPARTMENT <br /> A. Subdivision <br /> 1. The applicant proposes three future lots on two existing parcels which dictates a Parcel <br /> Map (two lots to three lots). The map shall be approved and recorded prior to building <br /> permit issuance for proposed Building #2. Required access easements and utility <br /> easements to serve the three lots shall be either shown on the Parcel Map or created via <br /> separate plat maps and legal descriptions. A Shared Maintenance Agreement or similar <br /> document should be prepared to govern how common area improvements will be <br /> managed and maintained in perpetuity. <br /> B. Preliminary Geotechnical Investigation <br /> 1. Building permit plans shall show that the site features (walkways, etc.) that adjoin <br /> building entrances shall be designed to allow for liquefaction-induced settlement of the <br /> building foundations as discussed in Section 5.1.2 of the Preliminary Geotechnical <br /> Investigation without creating access obstructions for those with disabilities. <br /> Agreement to Conditions August 3,2017 <br /> PLN17-0003 Page 12 of 19 <br />