My WebLink
|
Help
|
About
|
Sign Out
Home
8F Consent Calendar 2017 1106
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1106
>
8F Consent Calendar 2017 1106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 9:23:59 AM
Creation date
11/1/2017 9:23:55 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
11/6/2017
Retention
PERM
Document Relationships
Agmt 2017 Flagship Facility Services, Inc. Citywide Janitorial Services
(Reference)
Path:
\City Clerk\City Council\Agreements\2017
Reso 2017-154
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Exhibit A – Page 15 of 42 <br />• Day after Thanksgiving Friday after Thanksgiving <br />• Christmas Day December 25 <br /> <br />If a holiday falls on a Saturday, it is observed the previous Friday. If it falls on a Sunday, it is observed the <br />following Monday. Contractor shall be notified in advance if certain City buildings have additional closure dates. <br /> <br />Weekly: Shall mean one day per week. <br /> MWF; TTh: Shall mean on Mondays, Wednesdays and Fridays; shall mean Tuesdays and Thursdays. <br /> Monthly: Shall mean once per calendar month. All such work performed and completed in the last week of <br />each month. <br /> Quarterly: Shall mean every three calendar months. All such work to be performed and completed in the last <br />week of September, December, March and June, unless otherwise arranged with the Buildings Supervisor. <br /> Semi-Annually: Shall mean every six calendar months. All such work to be performed and completed in the <br />last week of April and October, unless otherwise arranged with the Buildings Supervisor. <br /> Annual: Shall be once per year, to be performed and completed in the last week of October, unless otherwise <br />arranged with the Buildings Supervisor. <br /> As-Needed: Shall be determined by Buildings Supervisor. <br /> Ceramic Tile Sealer: Apply protective sealer finish which adds luster but does not build up on floor surface. <br /> Clean: Remove all dirt, stains and marks with approved cleaner. Damp Mop: Remove all surface dirt and stains with a mop and warm water containing detergent or floor <br />cleaner as required and rinse. Damp Wipe: Remove all surface dirt with a damp cloth. <br /> Dust: Remove all loose dirt and debris. Treated cloths shall be used. <br /> <br />Hi-Speed Buffing: Hi-speed buffing machine shall be used to apply protective sheen on wax floors where <br />specified. <br /> <br />Scrub: Remove all dirt, stains and marks with an approved cleaner using a floor machine equipped with <br />scrubbing pads. Spray-Buff: Use floor machine equipped with spray buff pad. Apply solution and buff until dry. <br />Strip: Remove accumulation of old floor finish, all surface dirt, stains and marks. Rinse and dry. Sweep: Remove all loose dirt and litter with sweeping tool and treated cloth; in places difficult to sweep, use <br />brush or vacuum. <br /> Vacuum: Remove all surface and embedded dirt with a high efficiency filter suction cleaner (Filtering down to <br />particles 1 micron in size). <br /> Wax: Apply appropriate number of coats of approved floor finish. <br /> Facilities, Utilities, Supplies and Equipment <br />68
The URL can be used to link to this page
Your browser does not support the video tag.