My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent Calendar 2017 1218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8K Consent Calendar 2017 1218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:32:48 AM
Creation date
12/13/2017 11:32:47 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
Reso 2017-174
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
File Number: 17-673 <br />Decades ago, a below-ground sludge transfer line failed in the WPCP, and a temporary <br />above-ground line was installed to replace it. The temporary line is well beyond its useful life and <br />is located in an inconvenient location. This project will replace and relocate this temporary line to <br />below grade. <br />In two locations, there are existing pipes that extend above ground intruding into space that is <br />used for vehicle access in the WPCP. Because there is an upcoming pavement replacement <br />project, this is the most cost-effective time to relocate, replace and remove this piping and allow <br />unfettered access by large vehicles in these locations. <br />Analysis <br />The Water Pollution Control Plant provides a necessary service to the residents of the City of San <br />Leandro. This project will provide needed improvement to the infrastructure of the WPCP, and <br />while a small portion of this project is to improve access and appearance, staff believes those <br />specific upgrades will improve WPCP efficiency. <br />If the WPCP infrastructure were to fail, the cost of temporary facilities would be significant. And <br />because there is a project in place to replace the affected areas of asphalt paving in the WPCP, <br />this project will be completed in the most economical way. <br />Current Agency Policies <br />·City Council Goal: Maintain and enhance San Leandro’s infrastructure <br />. <br />Environmental Review <br />This project is determined to be exempt under the CEQA Guidelines Section 15302, <br />Replacement or Reconstruction. <br />Fiscal Impacts <br />This project will cost the City $91,818.00 plus any minor reasonable changes due to unforeseen <br />conditions. The Water Pollution Control Plant’s existing Enterprise Fund budgets will cover these <br />costs. <br />Budget Authority <br />This project was approved and funded in the 2016-17 in account 593-51-002-5240 for <br />$85,000.00 and was carried over into 2017-18 for this project. There is adequate funding in the <br />2017-18 budget in the 593-51-002-5240 account for the remaining balance of $6,818.00. <br />Attachment(s) to Related Legislative Files <br />Attached to Resolution: <br />o Non-Professional Services Agreement between the City of San Leandro and RTC <br />Page 2 City of San Leandro Printed on 12/12/2017 <br />202
The URL can be used to link to this page
Your browser does not support the video tag.