My WebLink
|
Help
|
About
|
Sign Out
Home
8K Consent Calendar 2017 1218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8K Consent Calendar 2017 1218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:32:48 AM
Creation date
12/13/2017 11:32:47 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
Reso 2017-174
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Non-Professional Services Agreement between City of San Leandro and <br />RTC Construction Management, Inc. for WPCP Pipe Removal & Relocation Project Page 16 of 20 <br />Thickener Drain:Consists of: <br />Removal of existing buried 12” cast/ductile iron line form 1’ outside concrete structure to 1’ from tie in to plant main <br />drain line. <br />Installation of new drain consisting of c-900 dr-14 pipe with ductile iron mj fittings. Tie drain line into existing <br />cast/ductile line at each end using Romac xr-501 or equal couplings. Wrap and tape all exposed ferrous metal with <br />poly wrap. Bed and backfill line with import sand to 6” above pipe. Compaction by water jetting is allowed. <br />Two existing bollards are directly over the line, they shall be removed prior to installation and reinstalled after <br />installation. <br />Sludge Line:Consists of: <br />Removal of existing above grade 6” sludge line, blind flange existing locations. Removal of existing sidewalk. Installation <br />of new buried sludge valve from above ground flanged connection point to two below grade connection points. <br />Installation of new buried service Dezurik PEC plug valves with 2” op nut and g5 christy box at grade. New line shall be <br />6” c-900 dr-14 with mj fittings. Entire line shall be restrained using Ebaa iron megalug mj glands and 2800 series bell <br />restraints. Line shall remain within 36” of the existing concrete structure and run in a similar layout as the existing above <br />grade line. Connections to existing below grade lines shall be via mj barrels or flange connects if available in existing <br />system. All flanges shall have 1/8” neoprene gaskets and stainless steel hardware. All buried ferrous parts shall be <br />wrapped and taped with poly. Bed and backfill line with import sand to 6” above pipe. Compaction by water jetting is <br />allowed. Exposed tie in shall be flanged ductile iron, painted with two part epoxy. <br />220
The URL can be used to link to this page
Your browser does not support the video tag.