My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent Calendar 2017 1218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8L Consent Calendar 2017 1218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:32:49 AM
Creation date
12/13/2017 11:32:48 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
Reso 2017-175
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br />2361 Qume Drive • San Jose, CA 95131 • 650 / 892-5014 Phone • 669 / 252-8801 Fax <br />Contractor’s License #120696 <br />Mechanical Services <br />650 / 892-5014 Cell <br />669 / 252-8801 Fax <br />2361 Qume Dr. <br />San Jose, CA 95131 <br /> <br />August 2017 <br /> <br /> <br />Subject: City of San Leandro Library – Boiler Replacements <br /> <br /> <br />DETAILED SCOPE OF WORK FOR CITY OF SAN LEANDRO LIBRARY <br /> <br /> <br />We propose to remove and replace two (2) 750 MBH Condensing boilers and all necessary ancillary <br />equipment and accessories for the above-mentioned project. Pricing is based upon our job walks and <br />discussions. Below is a breakdown of all equipment and services provided: <br /> <br />Mechanical Scope of Work: <br />Existing Fulton Boilers <br />• Demo <br />• Mobilize job site. <br />• Drain hot water loop and LOTO water / gas / electrical. <br />• Demo and haul off two (2) 750 MBH Fulton boilers. <br />• Demo and haul off existing flue pipe beginning at the boilers and terminating on the roof. <br />• Demo and haul off existing 4” PVC combustion air piping. <br />• Demo and haul off existing hot water piping, fittings and insulation as necessary to accommodate <br />new boilers. <br />• Demo and haul off existing gas line and fittings as necessary to accommodate new boilers. <br />• Demo and haul off existing stainless and PVC condensate line including current neutralizers. <br />• Demo and Haul off existing expansion tank. <br />• Demo and haul off existing chemical pot feeder. <br /> <br />Replacement Boilers <br />• Furnish and install two (2) 750MBH condensing boilers with stainless steel heat exchangers: <br />• Furnish and install (1) expansion tank. <br />• Furnish and install (1) chemical pot feeder. <br />• Furnish and install (1) circulating pump. <br />• Furnish and install (1) 1 Enervex CASV-250 Mechanical Draft System <br />• Furnish and install (2) FPE thermostatic mixing valves <br />• Furnish and install new flue pipe initiating at the boilers and terminating on the roof. <br />• Furnish and install new galvanized spiral combustion air ducts. <br />• Furnish and install new stainless steel and PVC condensate lines including neutralizers. <br />• Furnish and install all necessary hot water pipe / hangers / fittings and insulation. <br />• Furnish and install all necessary gas pipe / hangers and fittings. <br /> <br /> <br /> <br /> <br /> <br /> <br />247
The URL can be used to link to this page
Your browser does not support the video tag.