My WebLink
|
Help
|
About
|
Sign Out
Home
8L Consent Calendar 2017 1218
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2017
>
Packet 2017 1218
>
8L Consent Calendar 2017 1218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 11:32:49 AM
Creation date
12/13/2017 11:32:48 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
Reso 2017-175
(Reference)
Path:
\City Clerk\City Council\Resolutions\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br />2 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Electrical <br />• Furnish and install the following electrical: <br />• Furnish and install one (1) new 120 V pump circuit. <br />• Furnish and install one (1) new 120 V draft motor circuit to roof. <br /> <br />Start Up <br />• Refill hot water loop and Start / Test / Balance of the boilers. <br />• Refill hot water loop. <br />• Perform pressure test. <br />• Add closed loop chemicals. <br />• Water balance the boilers. <br />• Prepare the boilers for factory start up. <br />• Support factory start up. <br />• Demobilize the job site. <br /> <br />Other Services Provided <br />• Engineering, Installation Drawings and O & M Documentation. <br />• 12 month warranty on labor from date of beneficial use. <br />• Manufacturer’s standard warranty on equipment and material. <br /> <br />General Provisions and Clarifications <br />• All work to be performed during normal working hours. <br />• Abatement, if found, is not included in the above scope of work. <br />• Any items not specifically listed above are excluded. <br />• Proposal is valid 90 days from proposal date. <br />• ACCO will not be responsible for any pre-existing conditions which are not currently in <br />compliance with local mechanical and electrical codes. <br /> <br /> <br /> <br />Sincerely, <br />Tony Fini <br /> <br /> <br /> <br />Project Manager <br />ACCO Engineered Systems <br />tfini@accoservice.com <br />650-892-5014 <br /> <br />248
The URL can be used to link to this page
Your browser does not support the video tag.