B. Sidewalk, Curb, and Gutter. Two existing driveways, on Marina Boulevard are
<br /> abandoned, these shall be removed and replaced"with,City standard sidewalk, curb, and
<br /> gutter. Building Permit plans,shall catloutthese locations,,on,,,plans,,.,
<br /> C. Drivewav and Sidewalk Construction,Building Permit plans shall state that the driveway
<br /> and sidewalk construction,shall be:in cornpliaiwe wit'li,the City,of San Leandiro,Standard
<br /> plans Dwg. No. 102, case 3104 and t)wg,Na. IGO,',.case,3101.,
<br /> D. Underground Utility District M,/,,aster Plan. Marina Boulevard is,, in City adopted,,
<br /> Underground Utility District Master Plan;. The, applicant shall sishmmit valuation, of
<br /> Proposed work with the Building Pennnit appticattiormi in,order to,determine the,Overhead
<br /> Utility Conversion,Fee,
<br /> V. FIRE DEPARTMENT
<br /> A. Code Conformance, The,plans,are to,meet the currently adopted codes;and,standards, at
<br /> the time of the building,pertn,,ft, subm=ittal.
<br /> B. Key Box. A fire department key box ("l ox Box"'),,,,is,required.. Show the,location on
<br /> the building permit submittal,,,.
<br /> C. Fire Extinguishers, Fire extinguishers, are required, Show the,, locations of, all fire
<br /> extinguishers and state their rating on,the,bui1ding,.pctmi,,it submittal..
<br /> A. PUBLIC WORKS, REQUIREMENTS
<br /> A. Trash Enclosure. Should the, restaurant become operational,. construction,, of trash
<br /> enclosure will be,required.4,. 5,The:trash,enclosure shall be roofed and,designed to avoid
<br /> run-on to the trash enclosure, area. Runoff from trash ertclbsuires,, recycling areas,, or
<br /> similar facilities shall not discharge;,to,the storm datain,system,,,,, If the trash enclosure has
<br /> hot and cold water supply, a, drain inlet shall be, proposed such, that, the entire trash
<br /> enclosure area drains,lathe inlet. This,drain in"Iet,shalt,beconueeted to,the,sanitary sewer
<br /> system via a grease interceptor. Building Permit, plans,shall show,,these trash, enclosure
<br /> details.
<br /> B. Construction and, Demolition Debris, Recyclig, , Vtqj,,ect must eom',ply with, all City and,,
<br /> State construction and demolition debrisi,recycling requitenients., Permit applicants,must
<br /> demonstrate, compliance by completing and submitting an,, online Waste Management
<br /> Plan using Green Halo, Systems, (www. or, other approved
<br /> method prior to,permit issuance.,Applicants,must submit recycling and disposal receipts
<br /> online and submit the waste,management report beffire,scheduling the final inspection,.
<br /> Note: Project will not be,finaled until all recycling arid.disposal tags-have been,registered
<br /> into Green Halo,Systems,
<br /> C. Recycling Requirement . Applicant is,sub,ect to;Alameda County Mandatory Recycling.
<br /> Ordinance#2012-01.,'
<br /> VII. CONSTRUCTION PROVISIONS
<br /> Commercial Establishment EnclOSLire Guidelines available at
<br /> 5 Solid waste&recycling service provider: Alameda Caunty,lndustries(,HCl) 5t0'-3(,,5,7-7;29,2. Carvact ACI(510;-
<br /> 357-7282) for information regarding solid waste container sires and,to,cmifirm;container service location.
<br /> Agreement to Conditions September 11,2017'
<br /> PLN17-0015 2108 Marina Blvd. Page 6 of 7
<br />
|