My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-172
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2018 1:25:54 PM
Creation date
12/20/2017 4:29:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 1218 RG+CS REVISED
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 1218
8I Consent Calendar 2017 1218
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 1218
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Warranty <br /> Post-implementation support will be provided for a period of thirty(30)calendar days once the solution is <br /> brought into service. If multiple sites or locations are included as part of the solution, all sites or locations <br /> Will each have their own support period. Post-implementation warranty provides the following: <br /> • Minor changes and/or corrections to the solution that are included in the approved design based on <br /> the SOW. <br /> • Completion of all changes as part of an agreed punch list of actions <br /> • Fix or replacement of defective hardware installed by CONVERGEONE, INC.. <br /> Service Delivery Assumptions <br /> Services included within projects are always designed and priced to occur over consecutive days. Projects <br /> requiring multiple site visits and/or intervals of inactivity between events must be noted as such prior to <br /> acceptance of this SOW. The Project Team has some discretion within these matters but has limitations <br /> regarding resource commitments over weekends and Holidays. It is the Client's responsibility.to notify <br /> CONVERGEONE, INC. if the site requires any specialized training/access for personnel and/or Union <br /> trades for any tasks associated with this SOW. Notification of requirements must take place prior to quote. <br /> Any and all additional costs for post-quote changes or additional site strictures requiring specialized <br /> training.or Union Labor shall be chargeable to the Client. <br /> Therefore, requirements of this sort should be identified and reviewed prior to project commencement. All <br /> project changes thereafter will be addressed through the CONVERGEONE, INC.change order process. <br /> General Assumptions <br /> Please review this SOW carefully to ensure all contracted services are included. If a product or service is <br /> not described within this SOW, you should assume it is not included. Contact your CONVERGEONE, INC. <br /> representative with any questions or concerns. <br /> Client Responsibilities <br /> • Designate a single point of contact for CONVERGEONE, INC.. This individual will: <br /> o Thoroughly understand the business requirements and technical environment. <br /> o Be authorized to make timeline,configuration,and workflow decisions. <br /> o Ensure and document that all client-provided accountabilities are prepared. <br /> Consulting Services Agreement between City of San Leandro and 12/18/2017 <br /> ConvergeOne, Inc. for Polycom Videoconferencing Equipment Exhibit A—Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.