My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2017-172
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2017
>
Reso 2017-172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2018 1:25:54 PM
Creation date
12/20/2017 4:29:33 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
12/18/2017
Retention
PERM
Document Relationships
_CC Agenda 2017 1218 RG+CS REVISED
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 1218
8I Consent Calendar 2017 1218
(Reference)
Path:
\City Clerk\City Council\Agenda Packets\2017\Packet 2017 1218
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
field engineer in order to address any satisfaction issues at the time of testing. Return trips will be <br /> scheduled via the change management process. <br /> Knowledge Transfer <br /> Standard installation and documentation includes all manufactures'documentation as shipped with product <br /> and a onetime 30 minute overview of equipment/room functionality by the CONVERGEONE, INC. <br /> installation team and client contact while the CONVERGEONE, INC. installation team is on-site for the <br /> implementation of the project upon system completion (same day required). <br /> Change Control Procedure <br /> Despite good project planning, design and review, project plans often require some degree of change at <br /> some point. These changes are handled using Change Order requests,which must be agreed upon by all <br /> parties to the contract before such work can be performed. <br /> Either CONVERGEONE, INC, or the client may initiate a Change Order for any deliverable, work <br /> requirement, assumption or dependency that is part of the project. All requests must be in writing and <br /> handled by the CONVERGEONE, INC. Project Manager. CONVERGEONE, INC. will review the change <br /> and provide pricing as applicable before proceeding. The CONVERGEONE, INC. Project Manager may <br /> also engage project team members to assess the impact of the change. Agreed changes must be approved <br /> in writing by an authorized representative of the client, via email or a modified purchase order. <br /> CONVERGEONE, INC . Standard Service Hours <br /> Unless indicated within this SOW, pricing is based on the assumption that Services will be performed <br /> between 8:00 AM and 5:00 PM local site time, Monday-Friday, excluding CONVERGEONE, INC.- <br /> designated holidays ("Standard Service Hours"), Work performed outside Standard Service Hours may be <br /> subject to overtime charges at the following rates: <br /> V1811 12111,1101 V �,',g, ffl,lf�l , � <br /> 21,12111"M"" <br /> Evenings,Monday-Friday 5:00 PM-8:00 AM Saturday 12:00 AM(midnight)—Monday 8:00 AM <br /> Saturday,8:00 AM-12:00 AM(midnight) CONVERGEONE, INC.-designated holidays <br /> Consulting Services Agreement between City of San Leandro and 12/18/2017 <br /> ConvergeOne, Inc. for Polycom Videoconferencing Equipment Exhibit A—Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.