Laserfiche WebLink
Please note that this is an estimated amount. These fees are subject to change <br /> at the start of each fiscal year and will not be vested until issuance of building <br /> permit. <br /> IV. FENCING AND SCREENING REQUIREMENTS <br /> A. All fencing and walls on the project site shall be structurally sound, graffiti free <br /> and well maintained at all times. <br /> B. Barbed or razor wire shall not be installed on any fence or buildings on the <br /> property. <br /> C. All walls, fences, and landscaping within the 10 foot front setback or driveway <br /> shall be maintained at a height of not more than 36 inches above the top of the <br /> nearest adjacent curb and gutter to allow for adequate sight distance, or unless <br /> otherwise approved by the City's Transportation Engineer. <br /> D. Prior to issuance of Certificate of Occupancy, all electrical or gas meters, utility <br /> switch boxes, telephone interface cabinets, outdoor refuse, or other utility areas <br /> shall be enclosed or screened from view by a fence, wall or landscaping; details <br /> subject to approval of the Zoning Enforcement Official. The enclosure or screen <br /> shall be painted to match the color of the exterior of the building wall that it is <br /> affixed to. <br /> V. MAINTENANCE <br /> A. The project site and public right-of-way shall be well maintained and shall be <br /> kept free of litter, debris, and weeds at all times; during construction, the site <br /> shall be well maintained and shall be kept free of litter, debris, and weeds. Post <br /> construction, the project site and public right of way shall be well maintained <br /> and shall be kept free of litter, debris and weeds. The property owner shall be <br /> responsible for the maintenance of the project site and adjacent public right-of- <br /> way. <br /> B. Any graffiti shall be promptly removed from building walls and/or fences. The <br /> developer and its successors in interest shall comply with the rules and <br /> regulations of the City's graffiti removal program and shall grant a license and <br /> right of entry as requested to enforce the terms of such program. <br /> C. All landscaping improvements located on the project site and within adjacent <br /> public right-of-way shall be maintained in a healthy, growing condition at all <br /> times. Any trees by the sidewalks shall be maintained so as not to interfere or <br /> obstruct the public right-of-way for pedestrians and vehicles. The landscaping <br /> adjacent to the driveways and in the parkway strips shall be maintained so it does <br /> not exceed three feet in height above the top of the nearest adjacent curb and <br /> gutter to allow for adequate sight distance, or unless otherwise approved by the <br /> City's Transportation Engineer. <br /> Agreement to Conditions November 2,2017 <br /> PLN17-0002 Page 6 of 9 <br />