My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2017278935
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2017
>
Inst 2017278935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:54:15 PM
Creation date
1/16/2018 3:54:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
12/19/2017
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. The trash and recycle bins shall be kept inside the designated trash enclosure <br /> space and kept out of public view, except when it is necessary to place them at <br /> the curbside on days that the contents of the containers are picked up for <br /> disposal. <br /> E. There shall be no parking or storage of boats, trailers, camper tops, inoperable <br /> vehicles and the like outside the buildings, within the project. In addition, the <br /> garages shall not be used for storage, converted to living area, or any other use <br /> that would obstruct the garage to prevent its use for vehicle parking. <br /> VI. CONSTRUCTION PROVISIONS <br /> A. Construction activity shall not commence prior to 7:00 a.m. and shall cease by <br /> 7:00 p.m. Monday through Friday, and construction activity shall not commence <br /> prior to 8:00 a.m. and shall cease by 7:00 p.m. on Sunday and Saturday. No <br /> such construction is permitted on Federal holidays. As provided in this City of <br /> San Leandro's Noise Ordinance (ORDINANCE NO. 2003-005), "construction" <br /> shall mean any site preparation, assembly, erection, substantial repair, <br /> alteration, demolition or similar action, for or on any private property, public <br /> right-of-way, streets, structures, utilities, facilities or similar property. <br /> Construction activities carried on in violation of this Article may be enforced as <br /> provided in Section 4-1-1130, and may also be enforced by issuance of a stop <br /> work order and/or revocation of any or all permits issued for such construction <br /> activity. <br /> B. Construction activity shall not create dust, noise, or safety hazards for adjacent <br /> residents and properties. Dirt and mud shall not be tracked onto Oakes <br /> Boulevard from the project site. Standard construction dust control procedures, <br /> such as wetting, daily roadwashing and other maintenance functions to control <br /> emissions, shall be implemented at all times during outdoor construction. Dust <br /> generating activities such as grading, excavation, paving, etc. shall be <br /> scheduled the early morning and other hours when wind speeds are low. All <br /> construction activities entailing soil disturbance shall cease when winds exceed <br /> 30 miles per hour as an hourly average. <br /> C. The developer shall prepare a construction truck route plan that would restrict <br /> trucks to arterial streets that have sufficient pavement section to bear the heavy <br /> truck traffic, thereby minimizing noise and traffic impacts to the community. The <br /> construction truck route plan shall be reviewed and approved by the City <br /> Transportation Administrator prior to receipt of the grading permit. <br /> D. Truck hauling activities shall be restricted to 8:00 a.m. to 5:00 p.m. There shall <br /> be no truck hauling activity on Saturdays, Sundays and Federal holidays. <br /> E. Procedures with the highest noise potential shall be scheduled for daylight <br /> hours, when ambient noise levels are highest. <br /> Agreement to Conditions November 2,2017 <br /> PLN 17-0002 Page 7 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.