Laserfiche WebLink
B. Enclosure(s) should be easily accessible to collection vehicles. Driveways shall <br /> provide unobstructed access for collection vehicles. Applicant must ensure that there <br /> is adequate space for a collection vehicle to enter and exit the property in order to <br /> service containers. <br /> C. Applicant is subject to Alameda County Mandatory Recycling Ordinance #2012-01. <br /> ,www.Regy-ciingRuIeAC.o% <br /> X. CONSTRUCTION PROVISIONS <br /> A. Pest and vermin control measures shall be incorporated into the demolition and <br /> construction of the project. <br /> B. During construction the following high standards for sanitation are required: Garbage <br /> cans, construction dumpsters, and debris piles shall be removed on a minimum <br /> weekly basis. All food related trash items such as wrappers, cans, bottles, and food <br /> scraps shall be disposed of in closed containers only and shall be regularly removed <br /> from the site. At no time shall debris remain on site unattended within the front yard <br /> setback of the property. Inspections will be conducted as part of the regular <br /> construction compliance, to ensure compliance of the applicant and contractors with <br /> this requirement. <br /> C. Construction activity shall not commence prior to 7:00 a.m. and shall cease by 7:00 <br /> p.m. Monday through Friday, and construction activity shall not commence prior to <br /> 8:00 a.m. and shall cease by 7:00 p.m. on Saturday and Sunday. No construction is <br /> permitted on Federal holidays. As provided in the City of San Leandro's Noise <br /> Ordinance (ORDINANCE N . 2003-005), "construction" shall mean any site <br /> preparation, assembly, erection, substantial repair, alteration, demolition or similar <br /> action, for or on any private property, public or private right-of-way, streets, structures, <br /> utilities,facilities, or other similar property. Construction activities carried on in violation <br /> of this Article may be enforced as provided in Section 4-1-1130, and may also be <br /> enforced by issuance of a stop work order and/or revocation of any or all permits <br /> issued for such construction activity. Procedures with the highest noise potential shall <br /> be scheduled for daylight hours, when ambient noise levels are highest. The <br /> contractor(s) shall be required to employ the quietest among alternative equipment or <br /> to muffle/control noise from available equipment. <br /> Agreement to Conditions December 7,2017 <br /> PL,N 17-0054 Page 9 of']2 <br />