My WebLink
|
Help
|
About
|
Sign Out
Home
Inst 2018007376
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2018
>
Inst 2018007376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2018 1:40:46 PM
Creation date
1/31/2018 1:39:09 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
1/12/2018
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Construction activity shall not create dust, noise or safety hazards for adjacent <br /> residents and properties. Dirt and mud shall not be tracked onto Marina Boulevard <br /> from the project site during construction. Standard construction dust control <br /> procedures, such as wetting, daily roadwashing and other maintenance functions to <br /> control emissions, shall be implemented at all times during outdoor construction. Dust <br /> generating activities such as excavation, paving etc., shall be scheduled in the early <br /> morning and other hours when wind speeds are low. All construction contracts shall <br /> include the following requirements: 1) unpaved construction sites shall be sprinkled <br /> with water at least twice per day; 2) trucks hauling construction materials shall be <br /> covered with tarpaulins or other effective covers; 3) streets surrounding demolition <br /> and construction sites shall be swept at least once per day; and 4) paving and planting <br /> shall be done as soon as possible. City shall charge applicant, and applicant shall <br /> pay, for all costs of sweeping city streets in the vicinity of the project as necessary to <br /> control dust and spillage. <br /> E. The applicant shall prepare a construction truck route plan that would restrict trucks <br /> to arterial streets that have sufficient pavement section to bear the heavy truck traffic, <br /> thereby minimizing noise and traffic impacts to the community. The construction truck <br /> route plan shall be reviewed and approved by the City Transportation Administrator <br /> prior to receipt of the grading permit. <br /> F. Construction-related truck hauling activities shall be restricted to 8:00 a.m. to 5:00 <br /> p.m. There shall be no truck hauling activity on Saturdays, Sundays and Federal <br /> holidays. <br /> G. The property shall be secured during construction with a six (6) foot tall chain link <br /> fence and any other security measures in accordance with recommendation of the <br /> San Leandro Police Department. <br /> H. Construction workers on the project shall be provided clean drinking water, portable <br /> toilets and handwashing stations as sanitary facilities for use during all phases of <br /> construction. Said portable toilets shall be screened from view from the public right- <br /> of-way or located to the interior or rear of the site. <br /> X1. PERFORMANCE STANDARDS <br /> A. All uses and activities shall comply with the provisions of the San Leandro Noise <br /> Regulations (Title IV, Chapter 1 of the Municipal Code). <br /> B. No use, activity, or process shall produce vibrations that are perceptible without <br /> instruments by a reasonable person at the property lines of a site. <br /> C. No use, process, or activity shall produce dust that is perceptible without instruments <br /> by a reasonable person at the property lines of a site. <br /> D. Any storage on the site shall be screened or maintained inside of the storage shed <br /> or the building. <br /> Agreement to Conditions December 7,2017 <br /> PLN 17-0054 Page 10 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.