My WebLink
|
Help
|
About
|
Sign Out
Home
5A Public Hearings 2018 0220
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2018
>
Packet 2018 0220
>
5A Public Hearings 2018 0220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2018 1:44:49 PM
Creation date
2/14/2018 1:44:08 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agenda
Document Date (6)
2/20/2018
Retention
PERM
Document Relationships
Reso 2018-008
(Reference)
Path:
\City Clerk\City Council\Resolutions\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1018
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />EXHIBIT C <br /> <br />Recommended Changes to the Bay Fair Transit Oriented Development Specific Plan and Final <br />Environmental Impact Report from Planning Commissioner Tony Breslin during the January 18, 2018 <br />Planning Commission Public Hearing <br /> <br />1. In the Bay Fair TOD Specific Plan EIR, Table 35 (for reference see page 24 of Bay Fair TOD EIR <br />dated September 2017), and in the Bay Fair TOD Final EIR (FEIR), add new mitigation measures <br />under Impact T-1 (Intersections Levels of Service F) and Impact T-3 (Bus delays due to lane <br />reductions and increased traffic ): <br /> <br />• Under Mitigation Measure (s) column for Impact T-1 add: <br /> <br />MM-T-3: Additional Street Right-of-Way <br />The City of San Leandro shall study costs and benefits of purchasing additional <br />private property land for street right(s)-of-way adjacent to Hesperian Boulevard, <br />E. 14th, and Fairmont Drive to improve intersection Level(s) of Service (LOS), and <br />shall include in all future traffic studies benefits of additional lanes as Mitigation <br />Measure MM T-3. The improvement shall occur if traffic impacts studies show <br />significant improvement in forecast LOS, and if the City of San Leandro can <br />acquire right-of-way(s) through purchase or as condition of development of <br />future TOD projects. <br /> <br />• Under Mitigation Measure (s) column for Impact T-3 add: <br /> <br />MM-T-4: Additional Street Right-of-Way <br />The City of San Leandro shall study costs and benefits of purchasing additional <br />private property land for street right(s)-of-way adjacent to Hesperian Boulevard, <br />E. 14th, and Fairmont Drive to improve bus operations, and include in all future <br />transportation studies benefits of additional lanes as Mitigation Measure MM T- <br />4. The improvement shall occur if bus operations studies show significant <br />improvement in forecast bus operations, and if the City of San Leandro can <br />acquire right-of-way(s) through purchase or as condition of development of <br />future TOD projects. <br /> <br />2. In the Bay Fair TOD Specific Plan, Chapter 7 – Implementation Table 7.1 Implementation Actions <br />and Programs (for reference see current Page 121 of Specific Plan dated September 28, 2017), <br />modify Table 7.1 Medium Term Actions to include the following: <br /> <br />• Under column 1 Implementation Action add: Ashland Residential Area Parking <br />Program. <br />• Under column 2 Description add: Create Inter-Agency Parking Committee <br />managed by San Leandro and consisting of San Leandro, Alameda County, and <br />BART, and begin Ashland Area Resident Parking Program to implement and <br />enforce street parking time limits for non-residents. <br /> <br />• Under column 3 Parties Involved add: Inter-Agency Committee consisting of San <br />Leandro, Alameda County, and BART. Future parking enforcement by Alameda <br />County. <br />35
The URL can be used to link to this page
Your browser does not support the video tag.